Elevated Load Cell Stands
16
Visit our website
5. Wind each loose load cell cable to securely fit under the weigh stand channel.
6. Put the wound load cell cables under each weigh stand channel.
7. Attach the wound load cell cables to the weigh stand channel using the provided zip ties.
The wound load cell cables need to lay flat underneath the weigh stand channel.
Figure 2-16. Securing the Load Cell Cable
8. Tighten the load cell cable mounting clamps.
2.12.1 Junction Box Expansion
It is possible to use this junction box with other combinations. Use the expansion port on the main board to connect multiple
junction boxes in a series to accommodate more than two ELS weigh stands. Contact Rice Lake Weighing Systems for
additional details on applications involving more than two weigh stands.
Figure 2-17. Junction Box Expansion Board Location
Note
Wound Load Cell Cable
JPPP
PT4
T3
JP3
JP2
PT1
1
PT2
1
1
1
1
1
-EX
-SI
SHD
+SI
+EX
-SI
+SI
+EX
-EX
-SI
SHD
+SI
+EX
-EX
-SI
SHD
H
H
+SI
+SI
-SI
-EX
SHD
-EX
SHD
+EX
+SE
SS
-SE
+EX
1
EXP
I
M
-SI
+SI
-EX
SHD
+EX
+SE
-SE
Junction Box Expansion Location