Table 1.
Load Cell Wiring
Pin #
Wire Color
Function
1
Green
+SIG
2
White
-SIG
3
Red
+EXC
4
Black
-EXC
5
Yellow
Ground
2
iQube2 Junction Box Upgrade
Load Cell 5 Pin Male Connector Wiring
G
G
Blue Locktite
DRAIN WIRE
(SHIELD)
GREEN
WHITE
RED
BLACK
Raised
Diamond
Rectangular Tool Slot
Section G-G
Load Cell Stripping Wiring
Load Cell Wiring
Figure 4. Load Cell Wiring
12. Add blue Loctite
®1
425 to the two contact points as indicated in Figure 4.
13. Attach the load cell cables to the bottom two connectors on the junction box.
•
Apply Loctite.
•
Hand tighten until the connection is snug, plus another 1/4 turn. Only two threads should be visible.
Two Threads Visible
Figure 5. Connect Load Cell Cable to junction
14. Attach the home run cable to the top side connector.
15. Install the iQube2 junction into the forklift scale, using Loctite on the mounting screws.
16. Open the calibration access switch cover on the junction, set switch to the
On
position.
17. Plug in the power cable, and turn on the communication power box.
18. Calibrate the unit using Revolution software.
19. Connect the load cell cables to each side.
20. Connect the coiled interface cable to the top of the junction.
21. Align the iQube2 junction with the bolt holes in the scale and use an Allen wrench to tighten.
22. Place the cover plate in place and secure with a bolt and washer, and seal the unit.
Locktite
®
is a registered trademark of Henkel Technologies.