background image

Caution: Please read through the instructions carefully. Before starting 
this project, remove the system’s positive and negative connections 
from the battery or battery pack. This kit is designed for a 12-30V  
operation only. Operating this kit at a higher voltage will void any and 
all warranties. Look behind each drill location BEFORE YOU DRILL.  
Installer is responsible for damage (i.e. drilling into a wiring harness, 
battery, fuel tank etc.).  Do no attempt to activate or control this device 
in a hazardous driving situation.  

LGT-297 and LGT-298 

Strobe Light Bar, 10-30V DC 

Installation Instructions 

LGT-297 

LGT-298 

Reviews: