OPERATION
GR60/72 02/07
Operation Section 4-14
© 2007 Alamo Group Inc.
OPERA
T
ION
GR60 Mowers Only
Shorten the driveline profiles as follows:
•
Remove the driveline from the tractor.
•
Raise and lower the mower to find the position
with the shortest distance between the tractor
PTO shaft and cutter gearbox. Shut down the
tractor and securely block the mower in this
position.
•
Pull driveline apart and reattach yoke to PTO
shaft.
•
Hold driveline sections parallel to one another
and measure back 1” from yoke of each shaft
and place mark on opposite section. Cut this
length off with a saw.
•
Round off all sharp edges and debur.
•
Thoroughly grease then reinstall the driveline.
•
Recheck for proper operation.
GR72 Mowers
The GR72 driveline is a bar and welded sleeve assembly and its length cannot be modified as described
above. Contact your authorized dealer or Rhino Customer Service for recommendations to fit the mower to
the tractor if there is a potential problem bottoming out the driveline.
Engagement Check Procedure
•
With the driveline attached, position the mower to the point where the telescoping driveline is at its
maximum extension. Turn off the tractor and securely block the mower at this position.
•
Mark the inner driveline shield 1/8” from the end of the outer shield.
•
Disconnect the driveline from the tractor and separate the two driveline halves.
•
Measure the distance from the mark to the end of the inner profile. This length is the amount the driveline
profiles were engaged.
•
If the engaged length is less than 9”, the shaft is considered too short and should be replaced with a longer
shaft. Consult an authorized dealer to purchase the required driveline length.
NOTE: When raising the mower, at least 1” clearance must be maintained between the driveline and the
mower deck. If necessary, place an upper lift stop on the 3-point hitch control lever to limit the height the
mower can be raised. OPS-R-0005_B
Summary of Contents for GR60
Page 7: ...Safety Section 1 1 2007 Alamo Group Inc SAFETY SECTION ...
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ...Introduction Section 2 1 2007 Alamo Group Inc INTRODUCTION SECTION ...
Page 75: ...Assembly Section 3 1 2007 Alamo Group Inc ASSEMBLY SECTION ...
Page 83: ...Operation Section 4 1 2007 Alamo Group Inc OPERATION SECTION ...
Page 125: ...Maintenance Section 5 1 2007 Alamo Group Inc MAINTENANCE SECTION ...
Page 137: ......
Page 140: ...GR60 72 SOM 02 07 P N 00775743C Printed U S A GR 60 72 ROTARY CUTTER ...
Page 143: ......
Page 145: ......