
23
INSTALLATION – SYSTEM
THIS WATER HEATER IS NOT SUITABLE FOR POOL HEATING.
SOLAR COLLECTORS
The system is suitable for installation with Rheem NPT200, HBT200 / LCS or TBT200 / CSA2007 solar
collectors.
In Australia, systems with NPT200 solar collectors
are suitable for installation in all climate zones.
Collectors installed at an orientation greater than 60°
from true north may require an additional collector to
ensure adequate solar performance.
In Australia for climate zones 1, 2, and 3 there is a
risk
that
systems
with
selective
surface
HBT200 / LCS or TBT200 / CSA2007 solar collectors
may over perform. In these zones, systems with 2 or
more HBT200 / LCS or TBT200 / CSA2007 solar
collectors should be installed at orientations between
60° and 90° from true north only.
In climate zone 4, systems with selective surface
HBT200 / LCS or TBT200 / CSA2007 solar collectors
provide optimum performance compared with non
selective surface collectors, particularly in the
months of lower solar radiation.
IMPORTANT NOTES
Working on roofs is and should always be considered a hazardous activity, particularly early in the
morning, late in the evening, when the roof is wet or during and after periods of rain.
All work must be carried out in accordance with Local, State and Federal Occupational Safety, Health and
Welfare Regulations. In particular, the requirements for safety whilst manual lifting, working at heights and
on roofs.
Installers must be competently trained in:
Height Hazard Assessment
Working at Height Procedures
Assessment / Use / Wearing of correct height safety equipment (harnesses etc.)
All other relevant safety factors specific to the installation and maintenance work to be compliant with
suitable Occupational, Health and Safety Regulations / Codes.
All relevant permits shall be obtained from the regulatory authorities before commencing work to install
the solar hot water system.
All work carried out must be performed by appropriately qualified tradespeople or be suitably supervised
for trades assistant duties.
Every care must be taken to protect and warn occupants of the building and the public from personal injury
which may occur from falling tools, roof materials, fittings or any other hazards of a general nature.
Advise the occupants of any inconvenience which may occur due to disconnection of existing water and
electrical supplies.
The connection, attachment, integration or general association of other equipment or parts which either
directly or indirectly affect the operation or performance of this equipment could void the Rheem warranty.
All packaging materials must be removed from the water heater prior to its installation. This includes the
removal of the cardboard base of the carton from the underside of the water heater.