
14
Installation Checklist
A. Water Heater Location
B. Water Supply
C. Gas Supply
D. Relief Valve
E. Venting
❑
Close to area of vent.
❑
Indoors and protected from freezing
temperatures.
❑
Proper clearance from combustible surfaces
observed and water heater not installed on
carpeted floor.
❑
Sufficient fresh air supply for proper
operation of water heater.
❑
Air supply free of corrosive elements and
flammable vapors.
❑
Provisions made to protect area from water
damage.
❑
Sufficient room to service heater.
❑
Combustible materials, such as clothing,
cleaning materials, rags, etc. clear of the
base of the heater.
❑
Clearances from combustion air inlet
openings observed (see page 7).
❑
Water heater completely filled with water.
❑
Air purged from water heater and piping.
❑
Water connections tight and free of leaks.
❑
Gas line equipped with shut-off valve, union
and sediment trap.
❑
Approved pipe joint compound used.
❑
Soap and water solution used to check all
connections and fittings for possible gas
leak.
❑
Gas Company inspected installation (if
required).
❑
Temperature and Pressure Relief Valve
properly installed and discharge line run to
open drain.
❑
Discharge line protected from freezing.
❑
Flue baffle properly hung in top of heater’s
flue.
❑
Draft hood properly installed.
❑
Vent connector(s) pitched upward to
chimney
(¼" per foot of length minimum)
.
❑
Vent connector(s) securely fastened together
with screws.
❑
Single wall vent connector(s) at least 6”
from combustible material
.