RH Teen LAGUNA FULL LOFT BED Assembly Instructions Manual Download Page 6

9.

Attach the metal bracket (7) onto the side rails and guardrails. Insert screws (6) provided to pass through holes on the metal bracket (7) to the

pre-drilled holes on side rails and guardrails. Refer to FIGURE 6.

10. Set the bed slats (E) into the loft. Secure each slat by using screws (10) provided. See FIGURE 7.

11. For shipping purposes, both of concealed metal brackets (8) were removed and placed in the hardware package. The headboard and footboard

have pre-drilled holes where the ladder will be installed. Determine the desired location of the ladder and install the concealed metal bracket (8)
into the pre-drilled holes and secure it with the Phillips screws (9) provided. Refer to FIGURE 8.

7

6

FIGURE 6

9

FIGURE 8

10

FIGURE 7

L A G U N A   F U L L   L O F T   B E D   -   A S S E M B L Y   I N S T R U C T I O N S

6 8

/

Summary of Contents for LAGUNA FULL LOFT BED

Page 1: ...r color and a brief description of the part Or call 1 800 762 1751 CARE AND CLEANING DO NOT scratch or chip the finish DO NOT use abrasive chemicals for cleaning Dust often using a clean soft dry clot...

Page 2: ...ill be placed next to a wall the guardrail that runs the full length of the bed should be placed against the wall to prevent entrapment between the bed and the wall 13 The use of a water flotation mat...

Page 3: ...Nut 12 pcs Phillips Flathead Screw M4x20mm 22 pcs Round head Screw M4x25mm 42 pcs Metal Bracket 3 pcs Concealed Metal Bracket 2 pcs Phillips Flathead Screw M3x15mm 4 pcs NO ITEM DESCRIPTION QTY 6 7 8...

Page 4: ...your desired ladder location When short guardraill H is installed into the left side of the headboard or footboard refer to option A and B If the guardrail is installed into the right side of the hea...

Page 5: ...other upper side rail to the headboard KEEP HOLDING BOTH UPPER SIDE RAILS DURING NEXT STEP 7 Align the threaded rods on the footboard B H to the corresponding holes at the end of lower side rail C an...

Page 6: ...URE 7 11 For shipping purposes both of concealed metal brackets 8 were removed and placed in the hardware package The headboard and footboard have pre drilled holes where the ladder will be installed...

Page 7: ...footboard Use screws 6 provided to affix the top of ladder with footboard as shown in FIGURE 9 and FIGURE 10 13 Place the platform panels H on the upper bed then affix them with screws 10 See FIGURE...

Page 8: ...R U C T I O N S 14 MATTRESS INSTALLATION MATTRESS SPECIFICATION The following mattress and foundation sizes are specified for use with this loft bed Mattress 53 W x 75 L x 6 H on Full loft bed Note T...

Reviews: