![RH Teen Anaya Instructions Download Page 2](http://html1.mh-extra.com/html/rh-teen/anaya/anaya_instructions_1451155002.webp)
A
C
D
3
A
C
E
E
C
D
C
3
F
4.
Stand the Headboard (A) upright and attach the Side Rail (C), then screw the Allen Head Bolt (3)
into the pre-buried holes on Headboard (A), tighten with Allen Key ( 2 ), as shown in Fig-04.
5.
Repeat above procedure to attach the Footboard ( D ), then tighten all Allen Head Bolts ( 3 )
with Allen Key ( 2 ), as shown in Fig-05.
6.
Attach the 8 Slat Foot ( F ) to the Slat Roll ( E ), as shown in Fig-06.
7.
Screw the Slat Roll ( E ) on the top of the Side Rail’s side slats with Screw ( 4 ), as shown in Fig-07.
Fig-04
Fig-05
Fig-06
Fig-07
2
4
2
A N A Y A Q U E E N B E D I N S T R U C T I O N S
A S S E M B LY I N S T R U C T I O N S
2 of 2