background image

12

 

Contact Information

 

Warranty: 

All video products are designed and tested to the highest quality standard and backed by 

full  3  years  parts  and  labor  warranty.  Warranties  are  effective  upon  delivery  date  to 

customer  and  are  non-transferable.  RGBlink  warranties  are  only  valid  to  the  original 

purchase/owner.  Warranty  related  repairs  include  parts  and  labor,  but  do  not  include 

faults  resulting  from  user  negligence,  special  modification,  lighting  strikes, 

abuse(drop/crush), and/or other unusual damages. 

The customer shall pay shipping charges when unit is returned for repair. 

Headquarter: 

S603~604  Weiye  Building  Torch  Hi-Tech  Industrial  Development  Zone 

Xiamen, Fujian Province, P.R.C 

Summary of Contents for DV8

Page 1: ...on ingeniously designed which adopts board pluggable structure Adopts air cooling processing energy conservation and environmental protection Signal adaptive matching design to solve the problem of high resolution interference and out of sync when distribute signal Point to point correction technology allows the manufacturers to relax the requirements in LED brightness and color which reduce the p...

Page 2: ...1 CONTENT Product Introduction 2 Packing Configuration 3 Hardware Orientation 4 Back Panel 4 Operating Instruction 5 How to Connect 5 How to Work 5 Sending Card Installation 6 Contact Information 12 ...

Page 3: ...n 801 802 Nova MSD300 Nova MSD600 Mooncell Colorlight IT7 and DBstar Q2011 etc The signal adaptive matching design can solve the problem of high resolution interference and out of sync when distribute signal DV8 adopts air cooling processing energy conservation and environmental protection it can meet the demands of current LED screen control System Connection RGBlink offers solutions to demanding...

Page 4: ...3 Packing Configuration Note Chinese Standard American Standard or European Standard power cord is option Power Cord Antistatic Bag Certification ...

Page 5: ...e Orientation Back Panel Input Interface 1 DVI Input DVI I port Other Interface 3 5 Outputs of Sending Card 4 6 DVI Input Port of Sending Card 7 Power IEC 3 Port 8 Switch Output Interface 2 DVI Output DVI I port ...

Page 6: ...ork cable 4 Plug into power cord with IEC connector Same connections for the second row the third row and the fourth row interfaces as shown How to Work Push the power button to ON position the device will operate as follows 1 Input DVI signal each DVI input interface will output the signal to the 2 output interfaces 2 The output interfaces will output the signal to the corresponding inputs of sen...

Page 7: ... following parts The installation steps of Linsn 801 802 Nova MSD300 Colorlight IT7 and DBstar Q2011 sending card are the same take Linsn 801 for example specific steps are as follows 1 Choose any sending card block commend choose the first row or the third row on both sides of the sending card block as default binding the power cords in these positions and unscrew the captive screws then pull out...

Page 8: ...ie the power cords and unscrew the fixed screws on sending card block as shown in figure 2 Figure 2 3 Put Linsn 801 sending card into the sending card block and fix it with 2 fixed screws as shown in figure 3 ...

Page 9: ...hown in figure 4 Figure 4 Note It needs the power adapter when install the Mooncell sending cards as shown in figure 5 the install steps are the same as above Customers are advised to purchase the power adapter as we will not provide it and the salesman must list it explicitly in the order Should you have any further queries please contact our salesman ...

Page 10: ... remove the top panel as shown in figure 6 Figure 6 Then move the unilateral fixed groove on the base panel from position 1 to position 2 As the circuit board of Nova MSD600 is wider than other sending cards the purpose of moving the unilateral fixed groove is to increase the sending card installation width User can also move the other unilateral fixed groove according to the install quantity of s...

Page 11: ...e contact our salesman and fix the Nova MSD600 sending card to the block with fixed screws as shown in figure 8 Figure 8 3 It needs the power adapter Customers are advised to purchase the power adapter as we will not provide it and the salesman must list it explicitly in the order Should you have any further queries please contact our salesman and connect to the power interface with the dedicated ...

Page 12: ...11 Power interface Figure 9 The picture after install can be seen in figure 10 Figure 10 ...

Page 13: ...ble RGBlink warranties are only valid to the original purchase owner Warranty related repairs include parts and labor but do not include faults resulting from user negligence special modification lighting strikes abuse drop crush and or other unusual damages The customer shall pay shipping charges when unit is returned for repair Headquarter S603 604 Weiye Building Torch Hi Tech Industrial Develop...

Reviews: