@EC%
!/)$$
5--2/%[<;%<"2'1"#(0
<#32%[<;
<1/'#0"1%a302
Upper sheathing should rest
on lower sheathing
Step 24B Install Roof Sheathing continued
Install this Row First
48"x 96"
48"x 96"
48"x 96"
96" Long
48"x 83"
"
59" Long
"
Front
Gable
8" Roof
Overhang
Cut Top Row Width
Install Upper Sheathing Last
Plyclip
48"x 72"
"
48"x 48"
48" Long
48"x 59"
"
48"x 48"
83" Long
"
72" Long
"
48" Long
Sheathing packed in Pallets
"
@4
?)1%J@K%16,%FVfEgCf%[<;%$"221$%#(%"'*9%1,%&'L2%JFK
9,)/%FVfEFVf%$"221$4%:2]+)1%,(2%1,%cCfEFVf4
c4
<1'/1#(0%'1%0'8*2%L(22%#($1'**%/,,9%$"2'1"#(0%'1%1"2
9/,(1%,9%1"2%8)#*3#(07%
refer to the sheathing layout
below
4%5$#(0%'%$1/'#0"1%2302%-,$#1#,(%1"2%9#/$1%$"221$
-*)&8%6#1"%1"2%$,99#1%-'(2*$4%!"2%/,,9%$"2'1"#(0
$",)*3%&221%'1%+2(12/%,9%1"2%1/)$$2$4
F4
?)1%[<;%9*)$"%6#1"%8'+L%0'8*2%$#3#(04
`4
?)1%FVf%6#32%$"221$%1,%cCf%'(3%#($1'**%,(%8,11,&
/,6%-2/%*'.,)14
C4
?)1%FVf%6#32%$"221$%1,%9#1%,(%1,-%/,64%[/7%+)1%Bf
('//,62/%1,%'**,6%9,/%G2(1#(04%=($1'**%JBK%,(2%-*.+*#-
821622(%2'+"%1/)$$%9,/%1"#$%/,64
^4
:2-2'1%,(%,--,$#12%$#32%,9%8)#*3#(04
48"x59" Roof
Sheathing
48"x83" Roof
Sheathing
Straight
Edge
Install this Row Second
Gsble
Knee
Cut This Row to 36" Width
96" Long
96" Long