![Respekta Island CH 11050 ISB Installation Instruction Download Page 11](http://html.mh-extra.com/html/respekta/island-ch-11050-isb/island-ch-11050-isb_installation-instruction_1445147011.webp)
6. Guide the 4 wire cables through the holes
1
in the
suspension plate cover, the device cable through hole
2
and
mount the supplied connector on the device cable. Then run
the device cable through the recess
3
in the mounting plate.
(Fig .B4)
From now on, the presence of 2-3 people
is required.
One or two of them for lifting
and holding the hood body and one for the
final assembly of the cooker hood.
7. Have one or two helpers to bring the hood body up to a
appropriate height, so that the following assembly steps can
be carried out.
8. Insert the device plug into the socket
9. Mount the mounting plate on the ceiling with 4 ST6 x 40
mm screws (Fig. B)
10. Attach the 4 adjustable screws to the suspension plate, turn them to the correct length and not
too tight. Pass the 4 wire ropes through the 4 adjustable screws, determine the length of the wire
ropes and mark them. Use 4 wire locking nuts to secure them to the 4 wire ropes at the
marked locations. Make sure here that the 4 wire ropes are the same length.
(Fig. B5)
3
1
2
1
1
1
3
Fig. B5
Locking
screw nut
Lockig
screw
Adjustable
screw
Wire rop
fi200604atl
4