Product:
Resco Series 7000
Product Code:
S-7000R
Installation Guide
Return version. Updated August 2014
Step-by-step
RETURN VERSION
August 2014
Page 1: ...Product Resco Series 7000 Product Code S 7000R Installation Guide Return version Updated August 2014 Step by step Installation Guide RETURNVERSION August 2014 ...
Page 2: ...els LIFT them 3 DO NOT walk over Use caution machined edges may be razor sharp Although Compact Laminate panels are tough and durable they must be treated with care Panels can be damaged if not stored or handled properly during assembly 3 Sheets can scratch if not stored correctly ensure free of dust and debris 2 MAN LIFT Use suction lifting aids if available Take care when moving panels they can ...
Page 3: ...ny strong mineral acid such as sulphuric acid Battery acid hydrochloric acid nitric acid or phosphoric acid Any product containing strong mineral acids such as commercial toilet cleaners grout removers descalants rust removers etc Care must be taken where cleaning agents or solvents are highly acidic or alkaline as these may permanently damage the surface Other Tips In challenging environments the...
Page 4: ...ked so division panels are at the top and the doors are at the bottom Use Diamond tip drill bits for drilling into tiles Oversize Fascias rivet infill in the middle of the 2 other rivets on the other side of the pedestal at the opposite side to ensure that the infill can t be moved Sit in place and ensure that all the doors are perfect before final rivet Therefore you can adjust Ensure plumb both ...
Page 5: ...f toilets and ensure centered these are sometimes fitted different to the plans Fix back U Channels 1748mm centered on your marks 52mm below the Datum line a The U Channels are predrilled Ensure screws go into wall frame Use A 8GA x 32 screws with a F plastic anchor if required Leave fixing of Return Wall and Side Stiles until after Headrail in step Hold Headrail in position to find where side and...
Page 6: ...enter hole free Use A 8GA x 32 screws c Click the Stiles on to the brackets with the top flush with the Datum line d Finish fixing Stile through marked holes Use C 8GA x 50 screws Note If Stiles have hinges hold the Stile in place at Datum and mark on wall the centers of the hinges Attach brackets at marks to wall then attach Stile through the center hinge holes 3 per Stile Screw fix Stile through...
Page 7: ...n fix corner channel to division panel with 4 rivets Use 3 5mm drill bit with D Stainless Steel Pop Rivets 30mm and 600mm from the top and the same from the bottom RETURNVERSION Insert end Fascia in place with rounded edge at top and screw fix using 1 countersunk screws Ensure that you leave a gap of 2 3mm behind the screen for the aluminium bead to slot in to Quickly before the Polymer dries clip...
Page 8: ...remark the chalk line and that it s straight fits and looks good From the plans mark the floor Angle Brackets centers on the chalk line Note Make sure to leave enough pencil mark along the chalk line to be seen from under the Full Stile footprint this is so you can ensure panels will be centered Drill holes for the floor Angle Brackets Use 5mm masonry drill bit in concrete floor and 3 5mm drill bi...
Page 9: ...4 Headrail Sit in place a Ensure the Headrail is touching the walls perfectly b Drill 4mm holes in Headrail for fixing to the wall Stiles Use 4mm drill bit and the off cuts from the Full styles Check position of the new holes c Fix Headrail to side Stiles and or return Stiles Use 2 E 8GA x 20 screws at each end Fix loosely and tighten once all in place Place the first Full Stile over the appropria...
Page 10: ...4 E 8GA x 20 screws and tighten the screws on the Hinge Stile as well Repeat for the remaining Stiles and Fascias Check the last Fascia before fixing as it may need trimming Use a tungsten tipped blade Fix Fascia Panels in place through the top rail only by drilling down through center of Headrail into the Fascia top edge Screw all Headrail screws down hard into Headrail ensuring it s hard into pa...
Page 11: ... well Step 18 Fix division panels a Ensure all division panels line up with the bottom of each U Channel b Drill 4 x holes on one side of each U Channel Use 3 5mm drill bit with D Stainless Steel Pop Rivets 30mm and 600mm from the top and the same from the bottom Fit hardware Line up the coat hook with the pre drilled holes in the doors and screw hook on Use B 8GA x 12 screws Fix the indicator bol...