background image

Figure 13 

Install brackets. After this, 

Installation is finished. 

 

 

 

 

1

Side                            4PCS 

2

Steel pole         4PCS 

3

Conner           4PCS  M5x25 

4

Screw                        16PCS M5x10 

5

Screw                        4PCS 

6

Buckle                        Some 

7

Bracket                      2PCS 

8

Fabric            1PCS 

9

Manual           1PCS 

 

Operation direction 

First: Installation finished according to the above   

      drawing, then can choose    the appropriate   

      position to be hanging. 

Second: The bottom frame of the fixed screen   

         should leave the ground    about 1.2-1.5 

                    meters. 

Third: Attentions:To guarantee the projection   

Reviews: