![RePower NIUESS User Manual Download Page 17](http://html1.mh-extra.com/html/repower/niuess/niuess_user-manual_1443591017.webp)
Energy storage integrated machine
Installation
-11-
4 Installation
4.1 Unpacking confirmation
Before unpacking, check carefully whether the product information in the order is consistent with that
on the nameplate of the package box, and whether the product package is intact. If there is any question,
please contact the supplier timely.
Store the idled machine in its original package, and take anti-moisture and anti-dust measures.
After taking the machine out of the box, check the following items:
•
Confirm the main body of the machine is intact and free from any damage;
•
Confirm there is operation manual, interface accessories and installation accessories inside the
package box;
•
Confirm the deliverables inside the package box are intact and complete;
•
Check whether the product information in the order is consistent with that on the machine
nameplate;
Figure 4.1 Standard delivery list