background image

10

If the 

 key is pressed during a programme,  

P0

 appears on the display and all 

the lamps in the steam bath are switched off.

The duration of the programmes  

P1 

and  

P6 

idepends on the timer running 

period programmed. After timer runtime has expired, the program is termina-
ted.
The duration of the programmes  

P2 

to  

P5 

is 15 minutes. If a shorter timer 

running period is programmed, the programme is finished when the timer 
running period expires.
After the programme is finished, the white steam bath lighting goes on.

Colour therapy programmes

 P1

 

Joy programme

The ideal programme for getting to know colour therapy. 

All the lamps light up in different combinations, transitions flow due to the dim-
mer function.

 P2

 

Relax programme

The predominant colours in this programme are red and blue. Both lamps toge-
ther provide a meditative, violet-coloured light, unifying the differences bet-
ween the elements fire and water which are embodied by red and blue. 

The complementary colour of yellow at the end of the programme ensures 
equilibrium, reinforcing the special effectiveness of this programme.

 P3

 

Power programme

The energy colour red dominates in this programme, augmented by yellow. 
Green light moderates the strong activating power of the red light, preventing 
too strong an effect. It may be advisable to abort the programme early if the 
exposure to red light over a longer period feels unpleasant.

 P4

 

Slow-down programme

The relaxation programme mostly uses the soothing colours of blue and green. 
Orange-coloured light is created by the simultaneous use of the red and yellow 
lamps, creating variation and balance.

 P5

 

Happy sun programme

This programme has its special fascination due to the intense use of yellow light. 
The red lamp transforms to orange, toning down the transition to the final phase 
during which the red and blue lamps are activated.

 P6

 

Kids programme

This programme makes full use of all the colour therapy options available: the 

Summary of Contents for Vision 2000

Page 1: ...e that you observe the care instructions Repabad cannot be held liable for da mages caused by inappropriate use BEDDBV2000 1 E 05 2010 repa BAD GmbH Operating instructions for steam baths and steam bath technology with generator DE 510 Star DE 3000 E R DE 4000 E R DE 1005 DE 1050 Vision 2000 sensor ...

Page 2: ...ddition of scents 8 Aromatherapy optional 8 Colour therapy optional 9 Mist nozzles optional 11 MP3 docking station optional 11 Thermostat control if installed in the panel 11 Servicing 12 Exchanging the scent 12 Changing the illuminants 12 Decalcifying the steam generator 12 Determination of the water hardness 13 Setting the water hardness range 13 Anti lime management ALM and decalcification prog...

Page 3: ...hol consumption or directly after eating This could burden the cardiovascular system You can only use the repaBAD DD 1000 liquid aromas Other liquid aro mas may destroy the steam bath system The steam bath steam generator must be decalcified The decalcifying cycle can vary according to the respective existing water hardness Only use repaBAD decalcifying agents art no EK 500 If other agents are use...

Page 4: ...ge 3 If a function is selected by pressing a key this key is illuminated as long as the function is active Standard functions 38 0 C Display the display of all functions Keys for setting all functions Switching the steam bath on and off Setting the water hardness range Displaying and setting the temperature Displaying and setting the time Displaying and setting the time Displaying and setting the ...

Page 5: ...te steam bath lighting on and off and dimming it Starting the colour therapy programmes Mist nozzles optional please refer to page 11 Switches the mist nozzles on The key is illuminated when the mist noz zles are switched on MP3 docking station optional please refer to page 11 Volume adjustment for the MP3 player switched on ...

Page 6: ... on Press the key once to show the steam bath temperature on the display The key is illuminated whilst the temperature is displayed Setting the steam cubicle target temperature Press the key longer approx 2 seconds to switch over to temperature set ting mode The key flashes The set target temperature is then shown on the display The target temperature can be set as desired using the and keys Press...

Page 7: ...od remains saved If the timer period expires and lighting is switched on also colour therapy the white steam bath lighting automatically illuminates for a further 3 minutes Displaying setting the time Displaying the time When the steam bath is switched on briefly press the key once to show the time on the display The key is illuminated whilst the time is displayed When the steam bath is switched o...

Page 8: ...apy optional For aromatherapy dosed scents are added to the steam Up to 2 scents can be optionally selected Switching on the aromatherapy only for a steam bath which is switched on Briefly press the or key to switch the mixing of the respective scent on or off The corresponding or key illuminates if addition of scent is activated Setting the intensity of the aromatherapy Press the or key longer ap...

Page 9: ...al brightness setting Repressing the corresponding key for the lamp which is switched on or will activate the brightness setting mod The respective key flashes You can then set the brightness of the corresponding lamp using the and keys If the key is pressed longer whilst the steam bath lighting is on P0 appears on the display and all the lamps in the steam bath are switched off Calling up the col...

Page 10: ...ces bet ween the elements fire and water which are embodied by red and blue The complementary colour of yellow at the end of the programme ensures equilibrium reinforcing the special effectiveness of this programme P3 Power programme The energy colour red dominates in this programme augmented by yellow Green light moderates the strong activating power of the red light preventing too strong an effe...

Page 11: ... can be adjusted with the and keys The and keys must not be activated by another function The volume can also be adjusted when the steam bath is switched off Thermostat control if installed in the panel Thermostat Thermostat with a 2 way stop valve with two 2 way stop valves Two way stop valve for riser rail shower and a further load Flow rate settable by turning Scalding protection at 38 higher t...

Page 12: ...pull out the socket of the luminaire in a straight downward movement do not twist it Exchanging luminaires Re inserting the socket At the same time ensure that the retaining clips for the luminaire are positi oned on the grooves intended for this purpose Decalcifying the steam generator Danger of chemical burn Concentrated decalcifying agents can cause chemical burn If these agents come into conta...

Page 13: ...pressed for approx 5 seconds until H is shown on the left of the display The water hardness range currently set 1 to 4 is shown on the right of the dis play Use the and keys to set the water hardness range required Press the key again to save the changed target water hardness range or it is saved automatically after approx 5 seconds Anti lime management ALM and decalcification programmes Three hou...

Page 14: ...alcification agent is filled and starts the decalcification period of 12 hours The remaining decalcification time is shown on the display After expiry of the decalcification period PU 2 is shown on the display The steam generator is automatically pumped empty PA 3 is shown on the display as soon as the steam generator is emptied After approx 1 minute the steam generator is automatically filled wit...

Page 15: ...gh the filling ope ning using a funnel Unscrew the decalcification tube and screw the filler neck closed The steam bath control automatically recognises when the decalcification agent is filled and starts the decalcification period of 12 hours The remaining decalcification time is shown on the display Once the decalcification time has expired the steam generator is automatical ly rinsed with fresh...

Page 16: ...16 Examples of individual generators Filling opening on all acrylic and aluminium panels shown using steam bath Las Vegas as an example ...

Page 17: ...abrasive dust etc before cleaning e g by rinsing it with clear water Chemical drain cleaners may not be used Clean the steam bath with a household cleaning agent after use Use a wiper to remove all water drops on the glass cubicle Clean the acrylic parts at regular intervals with anti static acrylic and plexiglass cleaner repaBAD Spezial Reiniger special cleaner art no RR repaBAD s Care set art no...

Page 18: ...18 ...

Page 19: ...19 ...

Page 20: ...t be notified to the specialist fitter from whom our product was purchased specifying the data provided below Delivered on Customer s address Invoice no Reason for complaint Specialist fitter s address Fitter s stamp signature Only send the warranty card in case of a complaint BEDDBV2000 1 E 05 2010 repaBAD GmbH Technical hotline 49 0 7024 94 11 88 repaBAD GmbH Bosslerstr 13 15 D 73240 Wendlingen ...

Reviews: