
VIONiC RSLM20/RELM20 installation guide
7
Adhesive mounting installation
Thoroughly clean and
degrease the substrate
with a lint-free cloth.
Mark area for epoxy on
adhesive tape.
Support
dowels
Remove
excess
epoxy.
Allow 24 hours for epoxy to cure fully, then
clean scale using Renishaw scale wipes
(A-9523-4040) or a clean, dry, lint-free cloth.
OR
Remove backing liner from one side
and stick to underside of scale.
Clean underside of scale using approved solvents
(‘Storage and handling’, page 3)
.
Thoroughly mix and apply epoxy
then remove remaining
backing liner.
Area for RGG‑2 epoxy
(A-9531-0342)
Locate scale against dowels or ledge and
rotate down onto substrate. Press down
with firm finger pressure.
Mounting ledge
1.
2.
3.
4.
5.
6.
7.
8.