![Renishaw PI 7-2 Installation Manual Download Page 18](http://html1.mh-extra.com/html/renishaw/pi-7-2/pi-7-2_installation-manual_1441466018.webp)
Installation procedure
Installation procedure
WARNING: Ensure the PI 7-2 is disconnected from the mains supply during
installation.
WARNING: Do not exceed the operation ambient of 50 °C around the unit.
Do not install near sources of heat. Forced cooling may be required in final
installation.
. Rack mounting
The PI 7-2 may be mounted in a 19 “ equipment rack or may be free standing.
To mount the PI 7-2 alone requires 2 x 1/3 blanking panel kits (part number
A-1018-0123). Refer to figure 4 below.
Figure - Mounting the PI 7-2
To mount the PI 7-2 adjacent to a Renishaw PHC10-2 head controller or ACC2-2
autochange controller requires a rack mounting bracket (part number A-1018-0124) and
an enclosure link bracket kit (part number A-1018-0126).
Remove the blanking plugs from the side of each unit and fit the halves of the link
bracket before screwing them together, as shown in figure 5, with the screws provided.
!
!