15
1.800.627.4499
EV-Series Premium
ERV
UNIT PLACEMENT
3.2 SERVICE CLEARANCES
Primary consideration is sufficient space to open door latches and for the door to be able to
swing open at least 90°. See the dimensioned drawing in the front of this manual for required
clearances.
Foam Tape
Foam Tape
Metal Washer
Lag Screw or Concrete Anchor
(provided by others)
Lag Screw or Concrete Anchor
(provided by others)
Unit Flange
Optional Washer and Screw
(provided by others)
Hanging Bracket
FIGURE 3.1.0 MOUNTING THE ERV TO A STUD WALL
Risk of injury when lifting
unit and installing it
overhead.
CAUTION
3.3 AC POWER SOURCE
Power requirements: 120 VAC, 3.0 amps
The EV Premium has an integral 34 inch long power supply cord. The installer must provide a
standard, grounded 120 VAC outlet in the proximity of the ERV. Check all local codes.
3.4 LOAD BEARING CAPACITY OF SUPPORTS
The EV Premium ERV is to be installed by attachment to building structural members such
as joists, bar joists, beams, wall studs and columns. It is not be supported by attachment to
fixtures such as ductwork or air handlers unless the fixtures are permanently installed and
capable of providing adequate support. Whenever an ERV is installed on or supported by a
fixture, the installation must be approved by a design engineer.
3.1 MOUNTING THE UNIT
u
UNIT MAY BE INSTALLED IN ANY ORIENTATION
Orient the unit for the simplest duct layout and connections.
May be installed in any position providing sufficient clearance as shown in the front of this
manual. Preferred position is horizontal so that the hinged access door can swing down to
allow for easiest filter changes and cleaning of the enthalpic core.
u
MOUNTING THE EV PREMIUM ON A CONCRETE FOUNDATION WALL OR STUD WALL
Mount hanging bracket to the wall with appropriate concrete anchors. Use pre-cut foam tape
from small parts bag. Remove backing and apply two pieces of foam tape equally spaced
along the unit’s mounting flange to be held by the hanging bracket. Apply the other two
pieces of foam over two holes that will be used for fastening, on the other flange. The tape
should be applied in a “U” shape to cushion both the front and back of the integral flanges.
Lift unit and slide unit flange into the hanging bracket. Using metal flat washers, fasten
flange opposite hanging bracket to structure. Safety screws should similarly be installed
passing through the hanging bracket and flange. Make sure the screws, which you must
supply, are properly selected for the loads and substrate involved, 2" x #10 pan head screws
are recommended.
u
SUSPENDING THE EV PREMIUM FROM FLOOR JOISTS OR TRUSSES
The unit may be screwed directly to joists or trusses using the hanging bracket and integral
flange. Mount as described for mounting to concrete foundation wall.
NOTE: The door
is equipped with
slide-off hinges.
For the homeowner’s
convenience,it is helpful
to orient the unit so that
the door is easily removed
when unlatched.