
UM-B-041
SmartBond Production Line Tool
User Manual
Revision 4.8
02-Nov-2022
CFR0012
101 of 170
© 2022 Renesas Electronics
Example:
>a C003
●
To change the BD address that will be used in the next run use the '
b
' command.
This option is going to replace the
BD address
and
Statistics
values in the configuration file.
Example:
>b 00:00:00:00:00:01
Hardware Specific Tests
●
To automatically find the Windows COM port assigned to the Golden Unit, use the '
g
' command.
This command will replace the
gu_com_port
value in the configuration file.
Example:
>g
●
To verify that the Golden Unit COM port is found correctly and to check if the Golden Unit is
ready run the '
l
' command.
Example:
>l
●
To automatically find the Windows COM Port assigned for each DUT, use the '
p
' command. This
command will replace the
com_port_dut_x
values in the configuration file.
Example:
>p
Figure 86: CLI PLT DUT COM Port Enumeration ('p' Command)
●
To run a UART error check use the '
u
' command followed with a specific Baud rate.
Example:
>u 1000000
PLT Production Tests
●
Use the '
s
' command to begin testing with the current configuration.
during the testing. After all the tests have finished, the result remains on the screen as shown in
Figure 87: CLI PLT Testing
Figure 88: CLI PLT Testing Finished