
NOTICE!
Before the first filling of the system, all remov-
able heat pump screw connections and the
components delivered by us must be checked
to ensure that they are correctly sealed.
Damage that results from non-compliance is not
covered by the guarantee!
NOTICE!
Heat pump systems and components from
REMKO must be filled and operated with deion-
ised water (completely desalinated). We also
recommend the use of the complete heating
protection unit available from us. Full protection
with glycol should be used in cooling systems.
The system water should be tested each time
the plant is serviced, but at least once a year.
Damage that results from non-compliance is not
covered by the guarantee. Below you will find a
suitable form for documenting the filling of the
system.
Also refer to the chapter on “Corrosion protection”.
REMKO series WSP
30