5
Assembly instructions
for qualified personnel
Check the contents of the packaging for complete-
ness and check the unit for visible transport
damage. Immediately notify your contract partner
of any deficiencies.
DANGER!
All electrical installation work is to be performed
by specialist companies. Disconnect the power
supply when connecting the electrical terminals.
Check all plugged and clamped terminals to
verify that they are seated correctly and make
permanent contact. Tighten as required.
F
F
Fig. 12: Removing the housing cover
6
Installation
1.
Disconnect the power supply.
2.
Connect the 2-core cable to the terminals on
the rear side as shown in the wiring diagram.
3.
Install the room temperature regulation on
the wall.
4.
Choose an installation location that is guar-
anteed good air circulation and is not
affected by any sources of heat or cold.
5.
Make the connections in accordance with the
electrical circuit diagram. Electric connec-
tions must be carried out as fixed connec-
tions in accordance with the applicable regu-
lations!
6.
Check the terminal points for stability.
REMKO cabled remote controls
16
Summary of Contents for KFB 4
Page 19: ......