![REMKO EWS 200 E Assembly And Operating Instructions Manual Download Page 17](http://html1.mh-extra.com/html/remko/ews-200-e/ews-200-e_assembly-and-operating-instructions-manual_1439010017.webp)
NOTICE!
Heat pump systems and components from REMKO must be filled and operated with deionised water
(completely desalinated). We also recommend the use of the complete heating protection unit available
from us. Full protection with glycol should be used in cooling systems. The system water should be tested
each time the plant is serviced, but at least once a year. Damage that results from non-compliance is not
covered by the guarantee. Below you will find a suitable form for documenting the filling of the system.
Filling of heating system with
completely deionised water
Initial filling
Year 2
Year 3
Year 4
Filled on
System volume
[litres]
°dH value
pH value
Conductivity
[µS/cm]
Conditioning agent
(name and quantity)
Molybdenum
content
[mg/l]
Signature
Te
ch
nic
al
ch
an
ge
s a
nd
er
ro
rs
re
se
rv
ed
.
Your heating contractor:
Perform annual
control measurement!
VDI directive 2035
VDI directive 2035
Perform annual
control measurement!
Fig. 4: Form for logging filling with completely deionised water
17
Summary of Contents for EWS 200 E
Page 27: ......