REMKO ELT 10-6 Operating And Installation Instructions Download Page 5

5

Operating sequence

The units can be used in the 
respective operating modes for 
air heating and air circulation 
purposes (not ELT 3-2).

The units 

ELT 3-2 

can be operated 

exclusively in 2 heating stages 
(2.2 or 3.2 kW). 
They have a 3-stage operating 
switch with the functions: Heat (I) 
/ Off (0) / Heat (II).

The units 

ELT 10-6

 and 

ELT 18-9

 

can be operated with 

three

 heating 

settings and 

one

 fan setting. 

They have a 5-stage operating 
switch with the functions: 
Off (0) / Fan (1) / Heat (2-4).

All units can be equipped with 
a plug-in ready room thermostat 
(accessory) to ensure that the 
room temperature is constant. 
Once the desired temperature 
has been reached, the thermostat 
switches the heating operation 
off. If the room temperature falls 
below the set temperature, the 
thermostat starts up the heating 
operation again.

Commissioning

Heating 1st stage; 2.2 kW

Off

Heating 2nd stage; 3.2 kW

s

s

s

Operating switch ELT 3-2

One person, who has been 
adequately trained in the handling 
of the units, should be tasked with 
the operation and monitoring of 
the units.

The units must be in the intended 
horizontal position on their 
supports at all times during 
operation.

Off

Fan

1st heating stage

2nd heating stage

3rd heating stage

Operating switch
ELT 10-6 and ELT 18-9

3.  Connect the unit's power plug 

to a properly installed mains 
socket.

ELT 3-2

ELT 10-6 / 18-9

NOTE

For optimum operation the 
units should not be operated 
above an ambient temperature 
of 25 °C.

NOTE

The electrical connection for 
the units must be made at 
a separate feed point with 
a residual current device in 
accordance with VDE 0100, 
Section 55.

CAUTION

Extensions to the connection 
cable must only be conducted 
by authorised specialist 
electricians, taking into 
consideration the unit capacity, 
cable length and local use.

ELT 3-2

ELT 10-6
ELT 18-9

After switching off the units 
via the operating switch or 
the room thermostats, the 
supply air fan runs to cool the 
heating resistors for a certain 
time and then switches off 
automatically.

CAUTION

!

1.  Check the customer’s mains 

voltage and ensure sufficient 
fuse protection for the unit type 
in use.

Power supplies:

ELT 3-2  

230V/1~/50 Hz

ELT 10-6 

400/3~N/50 Hz

ELT 18-9  

400/3~N/50 Hz

2.  Move the operating switch to 

the "0" (Off) position.

The units are equipped with the 
following operating switches:

Summary of Contents for ELT 10-6

Page 1: ...on instructions This product is suitable only for well insulated rooms or for occasional use Edition EN Q03 Read the instructions prior to performing any task ELT 3 2 E ELT 10 6 E ELT 18 9 E REMKO ELT...

Page 2: ......

Page 3: ...6 11 Spare parts list for ELT 10 6 11 Exploded view of ELT 18 9 12 Spare parts list for ELT 18 9 13 Maintenance protocol 14 Technical data 15 Contents Carefully read this operating manual prior to co...

Page 4: ...or not as intended by untrained personnel Please observe the following notes The personnel tasked with operating the units must check the units for visible defects on the operating and safety devices...

Page 5: ...units must be in the intended horizontal position on their supports at all times during operation Off Fan 1st heating stage 2nd heating stage 3rd heating stage Operating switch ELT 10 6 and ELT 18 9 3...

Page 6: ...d for operation s s s Shutdown Fan Only the supply air fan operates in this setting Thermostatic regulation and heating operation are not possible in this operating mode Move the operating switch to t...

Page 7: ...t set the thermostat to a value that is higher than the room temperature If all of the functional checks have been carried out without any findings please contact an authorised service station Trouble...

Page 8: ...for the units is subject to continuous quality control Only high grade materials are processed the majority of which are recyclable You also contribute to environmental protection by ensuring that you...

Page 9: ...serve the right to modify the dimensions and design as part of the ongoing technical development process ELT 18 9 HW 1 9 S STB NK TB KL 1 M A1 A2 A1 A2 RT 2 3 L1 L2 L3 N PE L1 L2 L3 N 1 2 3 4 5 K1 K2...

Page 10: ...xterior cladding ELT 3 2 1103905 14 Back wall 1103913 2a Exterior cladding ELT 3 2 E 1103940 15 Mains cable with plug 1103901 3 Aftercooler thermostat 1104065 16 Strain relief 1101267 4 Temperature li...

Page 11: ...ing ELT 10 6 1107910 14 Strain relief 1107944 2a Exterior cladding ELT 10 6 E 1107909 15 Strapping plug 1101019 3 Inner casing 1103951 16 Thermostat socket cpl 1101018 4 Protective outlet grille 11039...

Page 12: ...ies We reserve the right to modify the dimensions and design as part of the ongoing technical development process Exploded view of ELT 18 9 E 1 2 18 23 25 17 20 8 11 19 21 22 24 16 10 3 9 7 6 8 5 13 1...

Page 13: ...ll 1107921 7 Floor panel 1107950 8 Temperature limiter with probe 1107960 9 Support 1107922 10 Protective hose 1107915 11 Fan blade 1101153 12 Drive clutch 1103956 13 Fan motor 230 V 1101254 14 Back w...

Page 14: ...5 Date Signature 16 Date Signature 17 Date Signature 18 Date Signature 19 Date Signature 20 Date Signature Unit to be maintained only by authorised specialists in accordance with the statutory regulat...

Page 15: ...Hz 230 1 50 400 3 N 50 400 3 N 50 Max rated current A 13 9 14 9 27 5 Max power consumption kW 2 25 3 25 10 65 18 2 Auxiliary current consumption at nominal heating power elmax kW 3 250 10 650 18 150 A...

Page 16: ...5232 606 260 E mail info remko de URL www remko de REMKO GmbH Co KG Klima und W rmetechnik Im Seelenkamp 12 32791 Lage Hotline within Germany 49 0 5232 606 0 Hotline International 49 0 5232 606 130 W...

Reviews: