![REMKO ELT 10-6 Operating And Installation Instructions Download Page 5](http://html1.mh-extra.com/html/remko/elt-10-6/elt-10-6_operating-and-installation-instructions_1438910005.webp)
5
Operating sequence
The units can be used in the
respective operating modes for
air heating and air circulation
purposes (not ELT 3-2).
The units
ELT 3-2
can be operated
exclusively in 2 heating stages
(2.2 or 3.2 kW).
They have a 3-stage operating
switch with the functions: Heat (I)
/ Off (0) / Heat (II).
The units
ELT 10-6
and
ELT 18-9
can be operated with
three
heating
settings and
one
fan setting.
They have a 5-stage operating
switch with the functions:
Off (0) / Fan (1) / Heat (2-4).
All units can be equipped with
a plug-in ready room thermostat
(accessory) to ensure that the
room temperature is constant.
Once the desired temperature
has been reached, the thermostat
switches the heating operation
off. If the room temperature falls
below the set temperature, the
thermostat starts up the heating
operation again.
Commissioning
Heating 1st stage; 2.2 kW
Off
Heating 2nd stage; 3.2 kW
s
s
s
Operating switch ELT 3-2
One person, who has been
adequately trained in the handling
of the units, should be tasked with
the operation and monitoring of
the units.
The units must be in the intended
horizontal position on their
supports at all times during
operation.
Off
Fan
1st heating stage
2nd heating stage
3rd heating stage
Operating switch
ELT 10-6 and ELT 18-9
3. Connect the unit's power plug
to a properly installed mains
socket.
ELT 3-2
ELT 10-6 / 18-9
NOTE
For optimum operation the
units should not be operated
above an ambient temperature
of 25 °C.
NOTE
The electrical connection for
the units must be made at
a separate feed point with
a residual current device in
accordance with VDE 0100,
Section 55.
CAUTION
Extensions to the connection
cable must only be conducted
by authorised specialist
electricians, taking into
consideration the unit capacity,
cable length and local use.
ELT 3-2
ELT 10-6
ELT 18-9
After switching off the units
via the operating switch or
the room thermostats, the
supply air fan runs to cool the
heating resistors for a certain
time and then switches off
automatically.
CAUTION
!
1. Check the customer’s mains
voltage and ensure sufficient
fuse protection for the unit type
in use.
Power supplies:
ELT 3-2
230V/1~/50 Hz
ELT 10-6
400/3~N/50 Hz
ELT 18-9
400/3~N/50 Hz
2. Move the operating switch to
the "0" (Off) position.
The units are equipped with the
following operating switches:
Summary of Contents for ELT 10-6
Page 2: ......