10.4.3 Reassembling the boiler
1. Fit all removed parts in the reverse order.
2. During inspection or maintenance work, always replace all gaskets of
the disassembled parts.
3. Check the tightness of the gas and water connections.
4. Put the boiler back into operation.
Fig.89
Putting the boiler into operation
AD-0000132-01
Check
Contrôler
Check
Contrôler
10 Maintenance
66
7625116 - v.06 - 17102018