5.5
Unpacking & initial preparation
1. Cut the packaging straps and remove.
2. Remove the cardboard box.
3. Take the 2 floor stands out of the packaging and place them on the
floor in front of the bottom of the boiler.
4. With 2 people, place the boiler upright on the floor stands.
5. Remove the pallet and the rest of the packaging.
Important
The boiler can now be moved with a lifting aid.
Fig.10
Unpacking the boiler
AD-0000137-02
1
1
2
3
4
5
5 Before installation
7625116 - v.06 - 17102018
25