15
06/04/06 - 300008441-001-C
Remeha P 420
Positioning of the baffles
- Replace the baffle plates as per the assembly sequence by
hooking them into each other before finally positioning them in the
flue way.
- Close the sweeping doors.
Follow the assembly sequence for the baffle plates as
shown in the diagram below.
The 8-figure part number of the baffle plate is moulded into
the metal
.
Flue ways
P 420-8
P 420-9 - P 420-10
P 420-11
P 420-12
P 420-13 - P 420-14
Upper
8229-0010 and 8229-
0022
2 x 8229-0010
2 x 8229-0010 and
1 x 8229-0022
2 x 8229-0010 and
1 x 8229-0022
3 x 8229-0010
Central
8229-0011 and 8229-
0023
2 x 8229-0011
2 x 8229-0011 and
1 x 8229-0023
2 x 8229-0011 and
1 x 8229-0023
3 x 8229-0011
Lower
8229-0012 and 8229-
0024
2 x 8229-0012
2 x 8229-0012 and
1 x 8229-0024
2 x 8229-0012
3 x 8229-0012
Summary of Contents for P 420
Page 1: ...Remeha P 420 Fuel oil gas boilers Technical instructions English 06 04 06 63190 UK...
Page 19: ...19 06 04 06 300008441 001 C Remeha P 420 Cladding...
Page 20: ...20 Remeha P 420 06 04 06 300008441 001 C Insulating material for body Panel RC 1...