Ordering Information
Specify:
1. Sprinkler: [Model F3QR56 Dry Pendent SIN R5714]
[Model F3QR56 Dry Horizontal Sidewall SIN R5734]
2. Escutcheon/Cover Plate: [None][Standard escutch-
eon][Model HB extended escutcheon][Model F1
recessed escutcheon][Model FP recessed escutch-
eon][Model CCP cover plate – pendent only]
3. Inlet Threads: [1” NPT][ISO7-1R1][3/4” NPT][ISO7-
1R3/4]
4. Inlet Fitting: [Long – Standard Inlet Fitting][Short “PL”
– Wet Pipe Systems only]
5. Sprinkler Temperature Rating: See Temperature Rat-
ings table
6. Sprinkler Finish: See Finishes Table
7. Escutcheon/Cover Plate Finish: See Finishes Table
8. Length: “A” Dimension (face of tee to face of ceiling
or wall) in ¼” (6 mm) increments – See Fig. 1 through
Fig. 9
Note:
The “A” dimension is based on a nominally gauged pipe
thread “make-up” of .600” (15mm) per ANSI B2.1 [approxi-
mately 7 ½ threads].
Reliable Automatic Sprinkler Co., Inc.
(800) 431-1588
Sales Offices
(800) 848-6051
Sales Fax
(914) 829-2042
Corporate Offices
www.reliablesprinkler.com Internet Address
Manufactured by
Recycled
Paper
Revision lines indicate updated or new data.
EG. Printed in U.S.A.
10/16
P/N 9999970175
The equipment presented in this bulletin is to be installed in accordance with the latest published Standards of the National Fire Protection Association, Factory
Mutual Research Corporation, or other similar organizations and also with the provisions of governmental codes or ordinances whenever applicable.
Products manufactured and distributed by Reliable have been protecting life and property for almost 100 years,.
Installation Data
Sprinkler
Model
Escutcheon or Cover Plate
Suggested Hole Diameter in
Wall or Ceiling
Required Centerline of Sprinkler
Tube/Inlet to Finished Ceiling
Vertical Dimension*
Installation
Wrench
F3QR56 Dry
Pendent
Standard Escutcheon
2-1/8” (54 mm)
Not
Applicable
F3 or F3R
HB Extended Escutcheon
2-1/2” (64 mm)
F1 Recessed Escutcheon
2-1/4” (57 mm)
XLO2
FP Recessed Escutcheon
2-1/2” (64 mm)
CCP Cover Plate
F3QR56 Dry
Horizontal
Sidewall
Standard Escutcheon
2-1/8” (54 mm)
4-5/8” to 12-5/8”
(118 mm to 321 mm)
F3 or F3R
HB Extended Escutcheon
2-1/2” (64 mm)
F1 Recessed Escutcheon
2-1/4” (57 mm)
cULus, NYC
4-5/8” to 6-5/8”
(118 mm to 168 mm)
XLO2
FP Recessed Escutcheon
2-1/2” (64 mm)
F1 Recessed Escutcheon
2-1/4” (57 mm)
FM
4-5/8” to 12-5/8”
(118 mm to 321 mm)
FP Recessed Escutcheon
2-1/2” (64 mm)
* Based on 5/8” (16 mm) centerline of sprinkler tube/inlet to defector vertical distance.
Maintenance
The Model F3QR56 Dry Sprinklers should be inspected
and the sprinkler system maintained in accordance with
NFPA 25. Do not remove the factory applied thermally sen-
sitive wax fillet between the bulb supporting cup and the
wrenching boss. Do not replace this wax with a substitute
substance.
An Alternate substance may interfere with proper operation
of the sprinkler. Do not clean sprinklers with soap and water,
ammonia or any other cleaning fluids. Remove dust by us-
ing a soft brush or gently vacuuming. Replace any sprin-
kler which has been painted (other than factory applied) or
damaged in any way. A stock of spare sprinklers should be
maintained to allow quick replacement of damaged or op-
erated sprinklers. Prior to installation, sprinklers should be
maintained in the original cartons and packaging until used
to minimize the potential for damage to sprinklers that would
cause improper operation or non-operation.
Summary of Contents for F3QR56 Dry
Page 13: ...13 Fig 10...
Page 14: ...Fig 11 14...
Page 15: ...Fig 13 Model XLO2 Wrench Fig 12 Model F3 or Model F3R Wrench 15...