![Regulus PG 600 SX Installation And Operation Manual Download Page 7](http://html1.mh-extra.com/html/regulus/pg-600-sx/pg-600-sx_installation-and-operation-manual_1434444007.webp)
REGULUS - PG 600 SX - www.rgulus.eu
7
│
2. INSTALLATION
1.
Read the entire Manual incl. safety information and how to take care of your battery.
2.
Make sure the power grid voltage corresponds to the voltage PG 600 SX is designed for.
3.
Connect the battery using M6 bolts (44Ah and 100Ah batteries) or M5 bolts (18Ah battery). MIND THE POLARITY, +
red / - blue or black. The max. torque is shown on the batteries (usually 5-7 Nm). Fit plastic caps onto the battery
terminals. Mind the right polarity!
4.
Plug the power supply cord of PG 600 SX into the a wall socket. WARNING – PG 600 SX will start running and from
the moment on the batteries are being charged. At the same time, the internal cooling fan also starts running.
5.
Connect your pump or another load by plugging its cable into the socket of PG 600 SX. It is necessary to stick to a
TN-S wiring system.
6.
Press ON/OFF push button to turn PG 600 SX on. A signal will sound. The green LED will stay lit,
indicating that PG 600 SX is running (standard mode, ready for backup).
7.
Nyní můžete spustit čerpadlo nebo jinou zátěž a odzkoušet provoz ze sítě bez střídače. Střídač se zapneautomaticky
při ztrátě napětí na vstupu
.
2.1 RECOMMENDED WIRING
- it is recommended to use solely an installation contactor with a 230 VAC coil, 2x NO + 2x NC.
- it must be ensured that the PE lead cannot be disconnected (e.g. by pulling out the coiled power supply cable from
PG 600 SX)!
- unconditional separation of the circuit fed from PG 600 SX from the mains shall be respected