13
• Install the strut between the two triangular supports
(Fig. 19). Following Fig. 19, insert special M8 nuts into
the triangle support rail. Then lay the strut onto the
rails and
fi
x it with M8x12 bolts with washers (Fig. 19).
• Continue assembling the remaining triangular sup-
ports with a pitch as shown in Fig. 2. Adjust this
distance so that the pitch of the triangular supports
is similar to that of roof anchors in Fig. 2 and the last
support shall be located about 500 mm from the ends
of both rails.
After
fi
xing the strut and other supports, kip the
entire structure into the position intended for
collector installation. (The strut is upright, T rail
of each triangular support lies on the ground.)
spanner No.13
3
2
c
Fig. 19: Strut installation
Fig. 20: Installation of further supports.
Fig. 18: Assembly using special bolts.
Fig. 17: Assembly using special bolts.
Special nut
for rails
rail
M8x12 bolt with
allen head
L strut
Summary of Contents for KPC1 BP
Page 1: ...1 Solar System with KPC1 BP Collectors EN v 1 6 Installation and Operation Manual ...
Page 24: ...24 15 CONNECTION DIMENSIONS ...
Page 27: ...27 ...
Page 28: ...28 ...