background image

Vertical Venting with Two (2) 90° Elbows 
- Initial vertical section.

Two 45° elbows = One 90° elbow

Option

V+ V1

H

Maximum total pipe: length, of 
all sections, must not exceed 
37 feet.  
Total horizontal sections must 
not exceed 17 feet.

Minimum of 1 foot between 
90° elbows is required.

A)

1’ Min.

4’ Max.

B)

2’ Min.

6’ Max.

C)

3’ Min.

9’ Max.

D)

4’ Min.

12’ Max.

E)

5’ Min.

15’ Max.

E)

6’ Min.

17’ Max.

Vertical Venting with Two (2) 90° Elbows 
- Initial horizontal section.

Two 45° elbows = One 90° elbow

Option

H + H1

V

Maximum total pipe: length, of 
all sections, must not exceed 
37 feet.  
Total horizontal sections must 
not exceed 8 feet.

Minimum of 1 foot between 
90° elbows is required.

A)

2’ Max.

1’ Min.

B)

4’ Max.

2’ Min.

C)

6’ Max.

3’ Min.

D)

8’ Max.

4’ Min.

Vertical Venting with Three (3) 90° 
Elbows - Initial vertical section.

Two 45° elbows = One 90° elbow

Option

V+ V1

H + H1

Maximum total pipe: length, of 
all sections, must not exceed 
37 feet.  
Total horizontal sections must not 
exceed 12 feet.

Minimum of 1 foot between 90° 
elbows is required.

A)

2’ Min.

3’ Max.

B)

3’ Min.

6’ Max.

C)

4’ Min.

9’ Max.

D)

5’ Min.

12’ Max.

Vertical Venting with Three (3) 90° 
Elbows - Initial horizontal section.

Two 45° elbows = One 90° elbow

Option

V+ V1

H

H + H1

Maximum total pipe: length, of 
all sections, must not exceed 
37 feet.  
Total horizontal sections must 
not exceed 12 feet.

Minimum of 1 foot between 90° 
elbows is required.

A)

2’ Min.

1’ Max.

2’ Max.

B)

3’ Min.

4’ Max.

5’ Max.

C)

4’ Min.

6’ Max.

8’ Max.

D)

5’ Min.

8’ Max.

12’ Max.

P121-P131 Gas Fireplace

73

June 2007 Regency Product Specifi cations Book

Gas Fireplaces

Gas Fir

eplaces

Summary of Contents for P121-LP2

Page 1: ...erial Top of Unit 8 Greyed out framing will not apply to all units Please refer to the manual L Framing Dimensions Description P121 P121LC RC P131 H Framing Width 46 3 4 1187mm 45 1143mm 45 1143mm I Framing Height 42 1 2 1080mm 42 1 2 1080mm 42 1 2 1080mm J Framing Depth 25 635mm 26 13 16 681mm 25 635mm K Vent Centerline Height 42 13 16 1072mm L Framed Chase Ceiling 48 1 4 1226mm M Electrical Inle...

Page 2: ...clearances are critical Combustible mantel clearances from top of the louvers are shown in the diagram below Mantel may be installed anywhere in the shaded area or higher Note If desired a non combustible mantel may be installed at a lower height Note Ensure the paint that is used on the mantel and the facing is heat resistant or the paint may discolour Note Ifthefireplaceisinstalled without the 3 ...

Page 3: ...orizontal sections must be supported every 3 feet P121 P131 Gas Fireplace Snorkel Terminations Snorkel Terminations For installations requiring a vertical rise on the exterior of the building 14 inch and 36 inch tall Snorkel Terminations and the Riser Vent are available Follow the same installation procedures as used for standard Horizontal Termination NEVER install the snorkel upside down Below G...

Page 4: ...feet Total horizontal sections must not exceed 8 feet Minimum of 1 foot between 90 elbows is required A 1 Min 2 Max B 2 Min 4 Max C 3 Min 6 Max D 4 Min 8 Max IMPORTANT When installing this unit vertically the 45 elbow when installed in conjunction with the Rigid Pipe Adapter will protrude past the unit 1 38mm when measured from the rear standoffs Note A 1 32mm clearance from the elbow must also be...

Page 5: ...Min B 4 Max 2 Min C 6 Max 3 Min D 8 Max 4 Min Vertical Venting with Three 3 90 Elbows Initial vertical section Two 45 elbows One 90 elbow Option V V1 H H1 Maximum total pipe length of all sections must not exceed 37 feet Total horizontal sections must not exceed 12 feet Minimum of 1 foot between 90 elbows is required A 2 Min 3 Max B 3 Min 6 Max C 4 Min 9 Max D 5 Min 12 Max Vertical Venting with Th...

Page 6: ...orizontal Terminations This diagram shows allowable venting configurations using one 45 Note Must use optional flue adapter Part 770 994 when using Rigid Pipe Maintain clearances to combustibles Horizontal vent must be supported every 3 feet Firestops are required at each floor level and whenever passing through a wall A vent guard should be used whenever the termination is lower than the specified mi...

Page 7: ... 3 Max 2 Min 6 Max C 5 Max 3 Min 9 Max D 8 Max 5 Min 12 Max Horizontal Venting with Three 3 90 Elbows Initial vertical section Two 45 elbows One 90 elbow Option V V1 H H1 Maximum total pipe length of all sections must not exceed 37 feet Total horizontal sections must not exceed 12 feet Minimum of 1 foot between 90 elbows is required A 2 Min 3 Max B 3 Min 6 Max C 4 Min 9 Max D 5 Min 12 Max Horizont...

Reviews: