40
|
City Series CB72EPV
installation
Optional Framing Kit CB72EPV
919-951a
01.24.19
1
CITY SERIES
Optional Framing Kit
[
[
[
[
[
[
[
[
[
[
[
$
%
&
'
(
)
*
+
,
-
.
CB72EPV framing kit parts layout*
*See last page of these instructions for assembled overview.
Assemble back frame
(view from back)
Install back frame on unit
Note: Extra screws are provided to assemble this kit.
Tools/hardware required:
- Level
- Stud fi nder
- Cordless screwdriver
- Phillips bit
- 5/16 inch hex head bit
- 2'' to 3'' wood screws (minimum 16)
- Flashlight
1. Assemble the back frame as shown below by assembling 2x Part B with 2x
Part H with 8 screws installed from back of frame.
%
%
+
+
2. Install the frame assembled in Step 1, onto the back of the unit as shown
with 2 screws on each side.
3. Place unit against wall in desired location. Level the unit by adjusting 4
leveling bolts on unit.
4. Install venting before proceeding further with framing kit construction. Refer
to manual for venting instructions.
w
w
w
w
Framing Kit with unit - Overall dimensions
Additional wall studs required
81-1/4" center to center
Before starting the installation, ensure the wall framing contains 2 additional
studs spaced 81-1/4" (2064mm) apart from center to center. The framing will
need to be secured to these studs as well as secured to the original studs
of the wall framing.
Summary of Contents for City CB72EPV-LP
Page 113: ...City Series CB72EPV 113 notes ...
Page 118: ...118 City Series CB72EPV ...
Page 119: ......