
Rev 1.0
25
4.5
Inspection and Maintenance Schedule
The check, inspection, examination and test routine as detailed in this document should always be carried out on schedule.
WAVE RECOMMENDED INSPECTION AND MAINTENANCE SCHEDULES
Usage
Category
No of Transfer
Lifts per year
Pre Use Check
Visual
Inspection
Examination
Wire Rope
Lifting
Assembly
Replacement
Critical Parts
Replacement
2
Unit
Replacement
1
Load Test
Post Load Test
Visual
Inspection
Contingency
<50
Prior To
Every Use
6 months
12 months 12 months
48 months
12 years
Routine
50 - 1000
6 months
12 months 12 months
24 months
10 years
Heavy
1000 - 4000
3
3 Months
12 months
6 months
12 months
8 years
Notes
1
This may be extended subject to a ‘condition & service assessment’ carried out by Reflex Marine or an Approved Partner
2
Only applies to critical parts marked “consumable”
3
When exceeding 4000 lifts, please refer to the Ultra-High Usage section (4.6) for further inspection guidance
In the event of a heavy impact, a detailed examination should be carried out to ensure integrity before conducting any further lifts
Table 14 WAVE Inspection and Maintenance Schedule