ReelCraft L 70100 123 7 Operating Instructions Manual Download Page 2

Series L 70000 Spring Driven Cord Reels

Page 2

www.reelcraft.com

Installation Instructions

Mounting

CAUTION:

Unless reel was specified differently when ordering, maximum instal-
lation height is 16 feet. Do not exceed this distance. Ensure that only 
a qualified electrician installs/services this equipment. Observe appli-
cable NEC, OSHA, and local codes when installing this equipment. 
Installation of GFCI cord reels should be performed by a qualified and 
licensed professional in accordance with local building codes and 
applicable NEC standards.

1.  Unpack and inspect the reel for damage. Turn by hand to check for 

smooth operation. Check for completeness.

2.  Configure reel for top, side or bottom-wind (bottom-wind for con-

stant tension reels only) electrical cable dispensing by removing 
bolts (1) securing guide arm bracket (2). 

3.  Determine new guide arm bracket location and remove corre-

sponding bolts. Position guide arm bracket to reel and replace 
bolts.

4.  Position reel on floor, wall or ceiling. Secure into place using four 

(customer supplied) screws or bolts (3).

Installing the Input Electrical Cable: 

15 and 20 AMP Models

WARNING:

Use only 12/3 or 12/4 SEOOW cable for input wiring. Ensure that appli-
cation does not exceed electrical rating of reel.
1.  Feed input cable (1) through elbow (2) and main shaft.
2.  Screw elbow (2) onto reel.
3.  Connect input wires (3) and collector ring wires (4) together using 

wire nuts (5).

4.  Take the provided zip tie (not pictured) and zip tie the input cable 

wires together closest to the slip ring.

5.  Assemble cover (6) to reel. 

Installing the Output Electrical Cable: 

15 and 20 AMP Models

WARNING:

Select output cable in accordance with power requirement of apparatus 
to be supplied. Ensure that application does not exceed electrical rating 
of reel. Use extreme caution, reel under tension. Avoid releasing latch 
mechanism.
1.  Manually turn sheave (1) until spring is tight, back off 2 turns and 

latch.

2.  Remove access cover (2).
3.  Remove 6” of output cable outer jacket (3) and add fork terminals 

(4) to ends.

4.  Route cable through strain relief (6), then through cut out in spool 

(7).

5.  Pull enough cable through hole for roughly a 1/2 an inner wrap 

shown.

6.  Connect output wires to terminal block (8) as shown.
7.  Connect ground wire to grounding stud (9) as shown.
8.  Using an ohmmeter check for ground faults.
9.  Take the provided cable clamp (not pictured) and attach it to the 

wire. Then take the cable clamp and screw it down to the right-
most screw on the brush assembly (with the brush assembly fac-
ing upward).

10.  Replace cover (2).
11.  Replace latch and wind cable onto reel.
12.  Install bumper stop (10).

1

2

4

3

6

5

2

1

5

3

9

4

8

7

6

10

Reviews: