Reef Pure RO Systems 4 Stage 100GPD Premium User Manual Download Page 8

REEF PURE RO SYSTEMS 

RO/DI SYSTEM USER MANUAL

Reef Pure RO Systems 

©

 2019

Page    of  

8

11

TDS METER PROBE PLACEMENT

(Ess & Premium Systems Only) 

The HM Digital

 

DM-1: Dual TDS Monitor is an important tool in monitoring the performance of your RO/DI 

system. It is also, being an electronic device, the only part of your RO/DI system which needs to be kept 
dry. Make sure when mounting the TDS meter using the included adhesive strips that a location away 
from any potential spills and direct sunlight is selected, ideally above your RO/DI system.  

While it is up to you where the two probes are installed we highly recommend the below con

guration: 

IN Probe:

 Installed between the RO membrane and DI resin Stage(s). This will allow you to monitor the 

TDS out of your RO membrane to ensure it is operating properly. The TDS reading out of the RO 
membrane should be <10 ppm. 

OUT Probe:

 Installed after the last DI resin stage. The reading after the DI resin should be 0 ppm at all 

times. A reading higher than 0 indicates that the resin has been exhausted are requires replacing.

SYSTEM INSTALLATION

HM DIGITAL

 

DM-1: DUAL TDS MONITOR - USAGE INSTRUCTIONS 

1. Press the “POWER” button to power on.  

2. To display the TDS level of the RO 

ltered water, slide the switch to the IN side. This reading can be 

used to monitor RO membrane performance. When this begins to rise above the usual reading, it is 
likely time to replace your RO membrane. 

3. To display the TDS level of the product (RO/DI) water, slide the switch to the OUT side. This reading 

can be used to monitor DI resin performance. Any reading higher than 0 TDS means you need to 
replace your DI resin. 

4. The displayed TDS will always be most accurate after approximately 10 seconds of running. 

5. Turn off the unit by pressing the “POWER” button. It will automatically shut off after 10 minutes.

It can also be useful to check your tap water TDS occasionally by moving one of the 
probes temporarily. Typically though there is no need to continue monitoring the tap TDS 
as the reading will seldom vary.

$

A full manufacturer instruction manual including more detailed installation notes is 
included with every TDS meter.

%

Summary of Contents for 4 Stage 100GPD Premium

Page 1: ...PAGE CONTENTS 1 Models Covered 1 SYSTEM LAYOUT 2 INCLUDED PARTS 3 SYSTEM OPERATION IMPORTANT INFORMATION 4 FILTER INSTALLATION INSTRUCTIONS 5 6 Connecting Disconnecting Quick Connect Fittings 5 Reverse Osmosis Membrane Installation 5 Refillable Deionisation Cartridge 6 SYSTEM INSTALLATION 7 8 TDS Meter Probe Placement 8 HM Digital DM 1 Dual TDS Monitor Usage Instructions 8 FLOW DIAGRAMS 9 10 4 Stag...

Page 2: ...D RO Membrane Premium Models Only 3 5 Micron Sediment Filter 4 Granular Activated Carbon Filter 5 6 Stage Systems Only 5 5 Micron Carbon Block Filter 6 Deionisation Resin Cartridge 7 Additional Deionisation Resin Cartridge 6 Stage Systems Only 8 Pressure Gauge Essentials Premium Systems Only 1 2 3 5 6 8 4 STAGE RO DI SYSTEM 5 STAGE RO DI SYSTEM 6 STAGE RO DI SYSTEM ...

Page 3: ... parts have been received In the unlikely event that any parts are missing or have been damaged please contact us immediately INCLUDED PARTS Wastewater Drain Connector 50GPD Thin Film Composite Reverse Osmosis Membrane Additional 50GPD Thin Film Composite Reverse Osmosis Membrane Premium Models Only HM Digital DM 1 In Line Dual TDS Monitor Essentials Premium systems Only ...

Page 4: ...r home s water pressure is below 65 psi we strongly recommended the installation of a HF 8367 RO Booster Pump sold separately Most RO DI systems are designed to work with a 4 1 to 2 1 wastewater to production water ratio This means that for every 1 litre of RO DI water produced 2 to 4 litres will be diverted to the wastewater line This water is not suitable for use in your reef aquarium as it cont...

Page 5: ...ghtening 4 Reconnect the RO tube s ensuring they are connected back to their original connectors Note Typically tubes that were connected to pressure gauges can be easily identified by the distinct groove left by the connector If unsure refer the the flow diagrams on pages 9 and 10 FILTER INSTALLATION INSTRUCTIONS It is critical that the membrane is pushed in firmly and as far as it can possibly go N...

Page 6: ...a centimetre 5 Make sure the threads are clear of any resin beads before replacing the foam insert and cap This will make it easier to screw the cap back on as well as ensure a water tight seal 6 Using the palm of your hand apply even pressure to the cap whilst screwing it back on 7 When installing the DI cartridge into the housing ensure that the rubber seal is on the top facing up FILTER INSTALL...

Page 7: ...be is the production water line A 4 Stage Systems This will be connected to the DI resin stage identifiable by the small piece of yellow tube which comes pre inserted this is just for your reference and can be discarded This tube can then be directed to your RO DI water storage container B 5 6 Stage Systems This will be connected to the RO membrane housing s production water connecter identifiable b...

Page 8: ...mes A reading higher than 0 indicates that the resin has been exhausted are requires replacing SYSTEM INSTALLATION HM DIGITAL DM 1 DUAL TDS MONITOR USAGE INSTRUCTIONS 1 Press the POWER button to power on 2 To display the TDS level of the RO filtered water slide the switch to the IN side This reading can be used to monitor RO membrane performance When this begins to rise above the usual reading it i...

Page 9: ...ATER 7 4 STAGE ESSENTIALS 5 STAGE ESSENTIALS 6 STAGE ESSENTIALS 4 STAGE ESSENTIALS 5 STAGE ESSENTIALS 6 STAGE ESSENTIALS FLOW DIAGRAM 1 5 Micron Sediment Filter 2 Granular Activated Carbon Filter 3 5 Micron Carbon Block Filter 4 Reverse Osmosis Membrane 5 Refillable Deionisation Resin Cartridge 6 Pressure Gauge 7 Flow Restrictor 8 1 2 BSP Source Water Connector 9 Waste Water Drain Connector ...

Page 10: ...UCTION WATER SOURCE WATER 7 4 4 STAGE PREMIUM 5 STAGE PREMIUM 6 STAGE PREMIUM FLOW DIAGRAM 1 5 Micron Sediment Filter 2 Granular Activated Carbon Filter 3 5 Micron Carbon Block Filter 4 Reverse Osmosis Membrane 5 Refillable Deionisation Resin Cartridge 6 Pressure Gauge 7 Flow Restrictor 8 1 2 BSP Source Water Connector 9 Waste Water Drain Connector ...

Page 11: ...n provided with 50 psi in pressure for a single membrane or 65 psi for 2 membranes installed in series This means that if your starting tap water TDS is 200 ppm then the TDS after your RO membrane would be 4 ppm THE DI RESIN ON MY SYSTEM SEEMS TO BECOME EXHAUSTED VERY QUICKLY WHY IS THIS HAPPENING The rate at which your DI resin will become depleted will vary depending on 2 major factors The most ...

Reviews: