
reedinstruments
www
com
4
INSTRUMENTS
INSTRUMENTS
Operating Instructions
Testing Procedure
1. Start with all switches upward for minimum capacitance.
2. Turn the switches down to add capacitance.
3. The ground terminal is connected to the metal enclosure for all
of the switches. In some circumstances the ground terminal can
be connected to external equipment to prevent environment
interference.
Note: Do not add more then 50 V DC to the output capacitor
terminals.
For service on this or any other REED product or information on other
REED products, contact REED Instruments at [email protected].
Notes _________________________________________
________________________________________________
________________________________________________
________________________________________________
________________________________________________
________________________________________________
________________________________________________
________________________________________________
REED Instruments
1-877-849-2127 | [email protected] | www.reedinstruments.com