REED R5406 Instruction Manual Download Page 4

reedinstruments

www

com

4

INSTRUMENTS

INSTRUMENTS

Operating Instructions

Testing Procedure

1.  Start with all switches upward for minimum capacitance.
2.  Turn the switches down to add capacitance.
3.  The ground terminal is connected to the metal enclosure for all 

of the switches. In some circumstances the ground terminal can 
be connected to external equipment to prevent environment 
interference.

Note: Do not add more then 50 V DC to the output capacitor 
terminals.

For service on this or any other REED product or information on other 
REED products, contact REED Instruments at [email protected].

Notes   _________________________________________
________________________________________________
________________________________________________
________________________________________________
________________________________________________
________________________________________________
________________________________________________
________________________________________________

 

REED Instruments

1-877-849-2127 | [email protected] | www.reedinstruments.com

Reviews: