REED PES8M Instructions Manual Download Page 2

PES8M   PE Squeeze-Off Instructions   

CAPACITY: 3" - 8"

 

1.   

 FOllOw All SAFETY PrOCEdurES.

2.    Determine pipe/tube size and wall thickness to be squeezed.    

 

Set stops for over-squeeze protection.

3  Assemble tool handle where desired.
4.  Insert ground probe into moist soil.
5.    Unscrew the main pressure screw.
6.    Lift and swing bottom bar.
7.    Center the squeeze-off tool on and square to pipe. This will allow  

 

pipe to flatten without jamming pipe against tie rods.

8.    Swing bar back over tie rods.
9.  Turn the feed screw to compress the pipe at a slow rate with  

 

momentary pauses to allow stress relaxation in the pipe to occur.  

 

This is particularly important when pipe is stiff in cold weather.

10.  Use SADDLe CLAmpS to aid compressing the pipe or as a  

 

safety precaution to prevent accident release.  Tighten down on  

 

nuts to pull both sides of clamps together.

11.  For thick pipe (1/2"-12 mm or larger), use saddle clamps to help  

 

squeeze the pipe.

12.  Squeeze the pipe only until flow is controlled or bottom bar  

 

contacts Over-SqUeeze prOTeCTIOn STOpS. Operation  

 

beyond this point may cause damage to pipe or tool.

809 - #58328

Catalog no. peS8m

Item Code #04308

Over-

SqUeeze 

prOTeCTIOn 

STOp

SADDLe 

CLAmpS

TOOl rEMOVAl

1.    A release rate of 1/2" per minute or less should be  

 

maintained to prevent damage to pipe as recommended  

 

by ASTm F1041.

2.    rounding can be done by rotating tool 90° and    

 

applying enough force to round pipe.

3.    Inspect squeezed section for damage before covering.  

 

procedures should be followed that will prevent the  

 

same area to be squeezed-off more than once.

SAFETY CONSIdErATIONS

pressure control situations requiring squeeze-off may involve 

working in the vicinity of escaping gas. Consider the possibility and 

potential hazard of static electricity and observe safety precautions. 

Safety precautions regarding static electricity generally include per-

forming squeeze-off in a separate bellhole remote from the blowing 

gas; applying a wet rag/tape to the pipe surface; and spraying 

area with a fine water mist to provide for the dissipation of static 

charge to the ground - grounding the squeeze-off tool.* Check 

the squeeze-off tool prior to use to assure it is the correct size; is 

properly functioning; and is properly adjusted for the squeeze-off to 

be done.

*reed strongly recommends use of the peGr Grounding Ac-

cessory (#04619) with pe Squeeze-Off Tools. Use a grounding 

accessory as a precaution against static build-up. Dissipate the 

charge and minimize the possibility of ignition.
Additional information on static electricity is available in the A.G.A. 

plastic pipe manual for Gas Service, Copyright 1989.

Phone: 800-666-3691 or 814-452-3691    

Fax: 800-456-1697 or 814-455-1697 

www.reedmfgco.com

reed Manufacturing Company

1425 west 8th Street

Erie, PA 16502 uSA 

 

 

 

    

Reviews: