![Reece Showerama 610 Single Bowl Technical Manual Download Page 4](http://html1.mh-extra.com/html/reece/showerama-610-single-bowl/showerama-610-single-bowl_technical-manual_1430833004.webp)
SHOWERAMA
ESPIRE PLUS ON KICK VANITY
CLEANING RECOMMENDATIONS
Caesarstone Tops:
Caesarstone® recommend wiping the surface with warm soapy water (a mild detergent) and a damp cloth or alternatively use a
quality spray and wipe type cleaner.
Spillage of strong solvents as found in some cosmetic products and hair dyes should be wiped off immediately.
Showerama’s Bathroom Polish is formulated for cleaning Stone Tops and can be purchased from your Reece Store.
Vanity Cabinets:
Showerama’s cabinets are moisture resistant but not waterproof. Cabinet surfaces should be cleaned with a damp cloth and dried.
INSTALLATION INSTRUCTIONS
NOTE:
Showerama recommend the vanity unit is NOT TILED IN around the base as this means the base of the cabinet is below floor
level and is then prone to water damage which is NOT COVERED under the Warranty.
Important:
Prior to installation it is important to unpack & inspect your products to ensure no damage has occurred in transit and that the
product IS CORRECT. If damage has occurred, or a visible defect exists, do not proceed with installation and contact supplier
IMMEDIATELY.
No claims for damages/defects will be recognized after installation.
Freight damage is not claimable if it is signed for as in good condition and/or free of damage.
Installation Procedure:
1.
Ensure that wall is plumb. Measure and mark out position of wall fixing and screw mounting board to wall.
If fixing to timber framed walls or partitioning, care should be taken to ensure that the wall is adequately reinforced
especially when fixing “Wall Hung” vanity units.
2.
Place vanity into position and ensure it is level (make minor adjustment if required). Drill pilot holes in the back
of the unit and fix unit to the wall using suitable screws. Ensure that the screws are fixed securely into a solid wall or
noggin. Minor adjustments may need to be made to align drawer runners and hinges.
3.
All final door and drawer adjustments are the responsibility of the installer at the time of installation.
4.
External edges where the unit meets the floor and wall should be sealed using flexible waterproof sealants.
Plumbers, please ensure a copy of the installation
instructions are left with the end user for future reference
page 4 of 4