8
• To hire an authorized service technician to
assemble the elliptical, call 1-800-445-2480.
• Assembly requires two persons.
• Place all parts in a cleared area and remove the
packing materials. Do not dispose of the packing
materials until you
nish all assembly steps.
• Left parts are marked “L” or “Left” and right parts
are marked “R” or “Right.”
• To identify small parts, see page 7.
• In addition to the included tool(s), assembly
requires the following tools:
one Phillips screwdriver
one rubber mallet
Assembly may be easier if you have your own set
of wrenches. To avoid damaging parts, do not use
power tools.
ASSEMBLY
1
2. Remove the screws (not shown) and the ship-
ping bracket (not shown) from the front of the
Frame (1). Discard the screws.
With the help of a second person, place the ship-
ping bracket (not shown) under the front of the
Frame (1).
Have the second person hold the
Frame to prevent it from tipping while you
complete this step.
Attach the Front Stabilizer (6) to the Frame
(1) with two M10 x 90mm Screws (84). Then,
remove and discard the shipping bracket (not
shown).
2
6
1
84
1.
Go to www.reebokservice.com/registration
on your computer and register your product.
• activates your warranty
• saves you time if you ever need to contact
Customer Care
• allows us to notify you of upgrades and offers
Note: If you do not have Internet access, call
Customer Care (see the front cover of this
manual) and register your product.
Summary of Contents for 1410 Elliptical
Page 4: ...4...