
Pre - Operation Inspection
①
②
③
④
⑤
⑥
⑦
⑧
The installation location meets the requirement.
Checking Items
The system has been securely installed.
Sufficient space for heat dissipation. No objects are left in the system.
System wiring is correct and firm. Refer to 240V diagram for more information.
Cables are properly installed and well protected without any damage.
The selection of AC circuit breaker meets local standard.
All terminals have been sealed.
Warning labels are not covered without alteration or occlusion.
Result
YES
NO
Notice
If the startup fails, refer to "Troubleshooting" in the user manual. For details about
LED indicators, refer to the user manual.
①
③
④
Operation
Following the steps to start the system.
Step : Connect to the grid.
②
Step : Turn on the battery isolation circuit breaker.
Step : Turn on the power button.
Step : Download the Redx Power App, QR Code for App download is on flip side of the document
Step
⑤
: Complete all steps in the App instructions.
Operating
status
RUN
Operation----Green
Fault----Red
Grid ----Green
No Grid ----Blue
Charge---Green
Discharge---Blue
VPP
GRID
BAT
SOC
Battery Capacity
LED Status
Monitoring ----Green(Flash)
Remote Control ----Blue(Flash)
On/Off grid installation
1
5
3
8
2
9
6
7
2
4
L=E+(2~3)mm
E
1
M4
1.5 N.M
DRM0 Installation
1
R
J45
RJ45
Connector
Waterproof Sealing
Ring
RJ45
Connector
Network
Cable
5
6
7
8
4
3
2
1
1
2
Nut
GRID N
GRID PE
EPS PE
EPS L
Waterproof
Sealing
Rings
GRID L
Connection
Plate
EPS N
Nut
Nut
RUN
VPP
GRID
BAT
BATT