Thank you for choosing a quality Redring product manufactured by
Applied Energy Products Limited, Peterborough, U.K.
2
Contents
Page
Installation Instructions
Important notes .............................................................................................................................. 2
What the installer will need ......................................................................................................... 3
Where to locate the SB
2
................................................................................................................ 3
Installing the water supply and steam vent pipes.................................................................... 3
Installing the mains supply ........................................................................................................... 4
Removing the front cover ............................................................................................................. 4
Fixing the unit on the wall............................................................................................................. 6
Connecting the water supply and steam vent pipes................................................................ 6
Connecting the mains cable......................................................................................................... 6
Replacing the front cover ............................................................................................................. 6
Schematic wiring diagram............................................................................................................ 6
Operating Instructions
General product description ........................................................................................................ 7
How to operate the SB
2
................................................................................................................. 7
How to clean and descale your SB
2
........................................................................................... 8
Trouble shooting guidance ........................................................................................................... 9
After Sales Service ...................................................................................................................... 11
Guarantee ...................................................................................................................................... 12
Installation Instructions
Important Notes
●
All installation must be supervised by a qualified electrician and plumbing engineer.
●
Installation and wiring must conform to current IEE Regulations (U.K.) and the Water
Regulations Act 1999. Local regulations may apply in other countries.
●
The steam vent connection MUST BE MADE, as required in these instructions.
●
The product must be supplied by a 13 Amp fused double pole isolating switch with a
minimum contact gap of 3mm in each pole.
●
Check that the mains supply matches the electrical rating on the product. The rating
plate is located on the bottom edge of the unit.
●
THIS APPLIANCE, AND ALL METAL PIPE WORK CONNECTED TO IT, MUST BE EARTHED.
●
If you have any queries about installing this product or after it has been installed, please
contact Applied Energy Products Customer Services (Ring 08709 000430). Customers
outside the U.K. should contact their local Redring distributor.
●
This product will need to be descaled regularly. The frequency of descaling will depend
on the hardness of the water supply.
Summary of Contents for SB2
Page 5: ...5 Fig 5b Fig 4 Fig 5a ...