![Redline Communications RedCONNEX AN-80i Installation Manuallines Download Page 20](http://html.mh-extra.com/html/redline-communications/redconnex-an-80i/redconnex-an-80i_installation-manuallines_1429360020.webp)
AN-80i
Installation Guidelines
70-00073-01-08-b
Proprietary Redline Communications © 2011
Page
20
of 58
May 27, 2011
2.7
Link Budget Tool
Identifying potential mounting locations will determine RF path and link distances. The
Link Budget Tool developed by Redline will calculate the expected link performance for a
specified range based on the selection of RF channel, power gain, antenna height, etc.
This is useful to determine if a proposed location is suitable for the intended application.
Figure 6: Site Survey - Sample Link Budget Calculation