background image

EL326 Installation Guide           Rev 10-Feb-14 

 

 

 

 

Page 2 of 33 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 

This page intentionally left blank. 

 
 

Summary of Contents for EL326

Page 1: ...www redlion net EL326 Industrial Ethernet Managed Switch Installation Guide Revision 10 February 2014...

Page 2: ...EL326 Installation Guide Rev 10 Feb 14 Page 2 of 33 This page intentionally left blank...

Page 3: ...Rev 10 Feb 14 Page 3 of 33 Management Guide Installation Guide Industrial Ethernet Switch Layer 3 with 26 Ports 20 10 100 1000BASE T Ports 4 Combination 10 100 1000 SFP Ports 2 10GB Expansion Ports 2...

Page 4: ...on to related features or instructions Caution risk of danger Alerts you to a potential hazard that could cause loss of data or damage the system or equipment Documentation must be consulted in all ca...

Page 5: ...es in accordance with local and national electrical codes Warning The unit must be properly grounded to comply with international standards Warning If equipment is used in a manner not specified by th...

Page 6: ...nformer aux normes internationales Avertissement Si l quipement est utilis d une mani re non sp cifi e par le fabricant la protection fournie par l quipement peut tre alt r e Avertissement Ne pas se c...

Page 7: ...as been tested and found to comply with the limits for digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection This equipment generates uses and...

Page 8: ...e following two conditions This device may not cause harmful interference and This device must accept any interference received including interference that may cause undesired operation ce dispositif...

Page 9: ...particular purpose All such warranties are hereby expressly disclaimed No oral or written information or advice given by Red Lion or Red Lion s representative shall create a warranty or in any way inc...

Page 10: ...nstallation and Mounting Page 13 Section 3 Thermal Considerations Page 17 Section 4 1 Power and Output Wiring Page 18 Section 5 2 Communication Ports Wiring Page 22 Section 6 LED Indicators Page 26 Se...

Page 11: ...port The major benefits of this are increased bandwidth and speed reduction or elimination of message collisions and deterministic performance when tied with real time systems These industrial Etherne...

Page 12: ...e Directive and IEC 61010 1 UL508 Industrial control equipment ANSI ISA12 12 01 Hazardous Locations CSA C22 2 No 142 and No 213 per cUL EMC emissions and immunity CE per the EMC directive IEC 61000 6...

Page 13: ...e next page for details on utilizing the mounting brackets The above image shows an EL326 in front style arrangement ports in front and power in the back mounted in a typical 19 rack prior to wiring I...

Page 14: ...ide of the switch that allow the brackets to be mounted in numerous positions for the best fit in your rack The brackets also have extra holes see blue arrows above allowing them to be shifted right o...

Page 15: ...33 Standard 19 bracket Part EK1 BRCKT 19 set of 2 Optional ETSI bracket Part EK1 BRCKT ETSI set of 2 Optional 23 bracket Part EK1 BRCKT 23 set of 2 Optional 23 24 bracket Part EK1 BRCKT 2324 set of 2...

Page 16: ...EL326 Installation Guide Rev 10 Feb 14 Page 16 of 33 Mechanical Dimensions for the EL326 and Brackets Note AutoCAD and other drawings are available on the CD or at www redlion net...

Page 17: ...ace above and below the switch as shown below This allows the heat to radiate to the air Any moving air in your rack will improve on the cooling of the switch Note An air gap is not absolutely necessa...

Page 18: ...e range for that supply Special Order Options Other power input options may be available Contact Red Lion for details Redundancy Operation The AA and DD power supply options offer dual redundant power...

Page 19: ...lug has a chassis ground terminal 4 that can be used to safety ground the switch This terminal is internally tied to the switch case In addition there is a ground terminal for each power input Use the...

Page 20: ...reen yellow Positive DC Power Systems For positive power systems such as 24 VDC put the positive lead on the terminal marked L and the return or ground lead on the terminal marked N If there is a chas...

Page 21: ...red with no alarms Open Closed shorted to common Switch powered with an alarm Closed shorted to common Open Alarm Wiring for EL326 Switches Wire Gauge Screw Torque The screw terminals are removable an...

Page 22: ...ver detection The RJ45 Ethernet port connector bodies on these products are metallic and are connected to the Chassis GND terminal Therefore shielded cables should be used to provide further protectio...

Page 23: ...above To remove a transceiver first pull down on the locking release arm and then pull the transceiver out The transceivers are hot swappable meaning they can be plugged in or removed when the switch...

Page 24: ...configuration The on board configuration program can be accessed from a terminal or a PC running a terminal emulation program The console cable is an RJ45 to DB9 adapter included with the unit part n...

Page 25: ...und topology plug one end of a stack cable into the Down port on the bottom unit and the other end into the Up port on the top unit Installing an Optional Module into the Switch To install an optional...

Page 26: ...there is a proper Ethernet connection Link and communications activity is detected OFF No link Indicates that there is not a proper Ethernet connection Link Make sure the cable has been properly conne...

Page 27: ...t or normal operations Flashing Green Switch is the Master unit of the stack system is initializing Amber Switch is operating as a Slave unit in the stack Flashing Amber System in Master arbitration e...

Page 28: ...of Service QoS with 4 priority queues o Scheduling schemes WRR and Strict priority o CoS per IEEE 802 1p and IP DSCP based o DiffServ DS ingress egress and remarking Rate limiting ingress and egress...

Page 29: ...Route table 8K Static route table 512 Multicast table 1K Unicast routing o Static unicast routes o RIP v1 v2 o OSPF o BGP Mulitcast routing o PIM DM o PIM SM o IGMP v1 v2 v3 o IGMP v3 proxy IP Redund...

Page 30: ...called the Hi Pot Slot provides for this capability To perform a Hi pot test please follow the directions below Hi Pot Test Step 1 Locate and expose the hi pot slot It is found on the side opposite t...

Page 31: ...push the card in about half way you should feel some resistance this is normal Push the card in until it either stops or there is only about left sticking out See images below Hi Pot Test Step 4 With...

Page 32: ...supply us with as many details about the problem as you can The information you supply will be written on the RO form and supplied to the repair department before your unit arrives This helps us to p...

Page 33: ...EL326 Installation Guide Rev 10 Feb 14 Page 33 of 33 This page intentionally left blank...

Reviews: