PRE-POWER CHECKS
TM-229 409 Page 23
Extreme 360
6-9. Output Diodes D1, D2
Ref. 907 161
Diodes D1, D2
−
Weld Output
Receptacles
+
Y
Read and follow safety
before proceeding.
1
Diode D1
2
Diode D2
Visually inspect D1 and D2 for dam-
age.
Check all measurements for output
diodes D1 and D2 (see Section
6-10).
If all measurements passed, the
output diodes D1 and D2 are OK.
Continue to the end of the pre
−
pow-
er flowchart (see Section 6-2).
2
1
Test Equipment Needed:
6-10. Output Diodes D1, D2 Test Point Values
Output Diodes D1 And D2
DVM Positive Lead
DVM Negative Lead
DVM Diode
DVM Ohms
D1
Terminal Anode
Secondary Heatsink
0.10 - 0.90
N/A
D2
Terminal Anode
Secondary Heatsink
0.10 - 0.90
N/A
Summary of Contents for EXTREME 360
Page 4: ......
Page 57: ...TM 229 409 Page 53 Extreme 360 211 328 E...
Page 59: ...TM 229 409 Page 55 Extreme 360 220 922 B...