background image

Red Arrow Trading

Elsworth House, Herries Road South, 
Sheffield, S6 1QS

T: 0800 195 0006     F: 0870 043 3946      

E: [email protected]      www.redarrowtrading.com

For models: YD-318BSS, YD-319BSS

Automatic High Speed Hand Dryer

Installation Instructions p.2

3. 

Drill four holes on the wall where the Hand Dryer will be installed, the diameter of the hole needs to be 7mm and the depth 

40mm. Put the plug into the hole. Then fix the main unit on to the wall with screws. 

4. 

Locate the panel with the main unit, push up slightly to locate the hook, which is at the base / ensure it is located on the 

panel. Refix the screws.

Maintenance

 

Please disconnect the power and clean the outer with natural detergent when required. Do not use acid or alkaline 

   bathroom detergent, lacquer thinners, abrasive etc. Do not use nylon brushes to clean as the friction can cause 
   scratches. 

 

Isolate when not in use for long periods of time, to extend the life of the product. 

 

If the machine breaks down, cut off the power quickly, contact a qualified electrician to repair it. 

Reviews: