Page 2 of 3
SAFE-T-SWITCH
®
SS700E
Electronic Overflow Shut Off Switch
Wiring Diagram
Re
d
Bl
ac
k
Gr
ay
Pur
pl
e
Or
an
ge
Probe
Orange (N/O)
cap it off when
not in use
SS700E
Primary
Secondary
24 VAC Common
24 VAC Hot
Thermostat
HVAC
C (transformer common)
R (typically red)
T1
24 VAC Transformer
1
5
4
8
Testing (Turn on Power to AC Unit):
Switch:
1. Once installed and the power is turned on and the
COMPRESSOR IS RUNNING
, the CPU will display a flashing green LED. If the green
LED does not come on, reverse the switch leads.
2. Test the sensor position: Test the sensor position by filling the auxiliary pan with water. Adjust the sensor so that the switch will
activate at a preferred water depth but before the pan overflows.
3. Test the switch by shorting across the probes with your finger or water. If wired correctly, the unit will stop and the red LED will
come on after 5 seconds. When released, after 5 seconds the red LED will go off, the green and amber LEDs will come on and the AC
unit will restart. If the switch does not cycle, try shorting across the probes with a metallic conductor or water. To turn off amber light,
see manual history reset tag on CPU wire.
The device must be installed strictly in accordance with manufacturer’s instructions (to ensure proper operation) and in
accordance with all applicable local plumbing, drainage and electrical codes.
ELECTRIC SHOCK HAZARD. Disconnect power supply before installing this product to avoid electrical shock and/or
equipment damage. Use in Class 2 (thermostat) circuit only, not to exceed 24 volts, 5 amps to avoid damage of fire hazard.
Use the SS700E as a stand alone switch only. It is not designed for use with any other switch device.
This product is intended for use in water only. Not for use in the presence of flammable liquids or vapors.
Refer to the appropriate HVAC equipment operation manual prior to installing this product.
Do not use on dual compressor systems.
Figure 1: Wiring Diagram for Unit Shutdown