Assembly
Completing the forestay (R20 – R40)
24
5.
Secure the furling section with two self-locking screws. Do not tighten the screws completely
yet.
6.
Place the threaded plate in the second recess in the furling section connector.
7.
Slide a standard furling section on to the furling section connector.
8.
Secure the standard furling section with two self-locking screws.
9.
When all four screw threads are engaged in the tapped holes in the threaded plate, tighten the
screws.
10.
Repeat steps 2 to 9 with other furling sections in the following order:
•
3000-mm-long standard furling sections
•
1500-mm-long standard furling section (if present).
11.a
If
no
foil reinforcement is to be fitted: repeat steps 2 to 9 with the feeder section.
If a foil reinforcement is to be fitted: repeat steps 2 to 5. Do not fit the feeder section yet.
Pos: 31 /ZINDEL/Rollreffanlagen/Montage/Alu/R10 - R40/Profilverstärkung montieren @ 1\mod_1399887096690_13349.docx @ 13915 @ 3 @ 1
Summary of Contents for RF90
Page 4: ...Notes www reckmann com ...
Page 74: ...Notes 70 ...