Timber Frame Installation
ZERO CLEARANCE HYBRID INSTALLATION
IMPORTANT
Install unit and
fluing before
plasterboard.
C
D
(Recommended only)
Floor
0 mm
Sides
25 mm
Top
100 mm
Flue Outer
25 mm
CLEARANCES FROM
COMBUSTIBLES
NOTE:
All Hybrid fires and flue kits are
to be installed PRIOR to plasterboard.
Plasterboard is to be run past stud frame
and up to fire opening terminating in
square edge.
MODEL
A
B
C
D
HYBRID 850
1020
1000
475
2100
HYBRID 1000
1020
1150
475
2100
HYBRID 1500
1100
1650
475
2100
HYBRID 1800
1235
1950
475
3000
HYBRID 3300
1235
3450
475
3600
Frameout Dimensions (in mm)
12
A
Plaster to run
beyond stud and
finish to edge of
opening
Do not block air
intakes
HEATER
B
Right Hand Hybrid shown
Summary of Contents for Hybrid 1000
Page 21: ...21 TYPICAL POWER FLUE FRAMEOUT Fan Casing Pressure Differential Switch Motor Motor...
Page 30: ...30...
Page 31: ...31...