Technical support: www.real-el.com
4
Network Load Controller
ENG
AR-01
If none of the above methods can solve the problem, please seek professional advice at your
nearest service center. Never attempt to repair the product by yourself.
Notes:
• Technical speci
fi
cations given in this table are supplemental information and cannot give
occasion to claims.
• Technical speci
fi
cations and package contents are subject to change without notice due
to the improvement of TM REAL-EL production.
No voltage in the power
supply network.
А
NL
С
is out of order.
А
NL
С
is out of order.
Automatic network load
controller is not turned on.
А
NL
С
is on, but voltage is absent
in sockets.
Excess heating of the device,
sparkling, burning odor.
Make sure that voltage is
available.
Address to a service-center.
Disconnect
А
NL
С
from the mains
socket and address to a
service-center.
Cause
Problem
Solution
5. TROUBLESHOOTING
Attention! Do not overload
А
NL
С
’s sockets - it can lead to the out of order of the device.
Power consumption of devices connected to
А
NL
С
’s every socket must not exceed 3.6 kW.
Parameter
Rated voltage, V
Maximum load current for every socket,
А
Maximum power for every socket, kW
Operation threshold according to power consumption, W
Turn-on delay time of the secondary load, sec
Turn-o
ff
time of the secondary load, sec
Dimensions, mm
Weight, g
Value
~230
16
3.6
100
not less than 2
not less than 0.3
94 × 80 × 81
130
6. TECHNICAL SPECIFICATIONS