Ready Rack FH2G Installation, Operation And Maintenance Manual Download Page 11

FH2G 

 Express Dryer 

Installation, Operation and Maintenance Manual 

10 | 

P a g e

 

 

 

Check the door operation for latching and sealing as well as free motion.  

 

Test the heating and cooling cycle. Recommend 15 min FAN AND HEATING (+8-10 F) and 10 min 
FAN ONLY (-8-10F drop).  

 

Wipe down the interior with a non-caustic solution to remove any residue from washed 
equipment. 

 

Check the power connections for frays for damages.  

 
ANNUAL INSPECTION FOR HIGHER VOLUME OPERATIONS (QUALIFIED PERSONNEL) 

 

Properly lock out / tag out power supply.  

 

Disconnect duct and move unit away from the wall.  

 

Remove and inspect inlet covers and heating duct covers.  

 

Clean and remove all debris, dust or cobweb build-up from the heating tunnels.  

 

Check for tightness of all electrical components and fittings. DO NOT OVERTIGHTEN HEATING STRIP 

TERMINAL STUDS.  

 

Check unit for level and adjust feet as necessary.  

 

Check the shelves for damage or burrs from wear. Confirm sliders are secure.  

 

Check hanging rail supports for security.  

 

Wipe down the interior with a non-caustic solution to remove any residue from washed equipment.  

 

Summary of Contents for FH2G

Page 1: ...FH2G EXPRESS 2 GEAR DRYER INSTALLATION OPERATION AND MAINTENANCE MANUAL REVISION 1 2019 www ReadyRack com 800 991 2120...

Page 2: ...de out galvanized wire racks with adjustable positions Capable of vented and unvented operation Unpacking the Express Dryer FH2G Two Gear Remove shipping crate sides and set aside taking care not to d...

Page 3: ...ooms If adequate air circulation in the space is not available the unit should be converted to ducted operation Placement in unvented or sub grade internal rooms with limited air movement can create m...

Page 4: ...e door in the frame during levelling The door should not bind or swing on its own when the cabinet is properly levelled Door alignment will vary from the pallet to the floor and small adjustments in t...

Page 5: ...a standard 120V 3 prong grounded plug This can be utilized with any 15A circuit If required the cabinet can be permanently wired into a station power supply by the following steps by a licenced electr...

Page 6: ...uitable air make up or dehumidification The unit is provided with a galvanized fan cover for un ducted applications Lock out the unit or unplug from the power supply Remove the 4 12 self tapping screw...

Page 7: ...0 may require the use of a booster fan not included to ensure pressure losses are overcome An external self closing louvre should be utilized to keep out pests and rain water The use of legacy square...

Page 8: ...ROW UP or ARROW DOWN to adjust time STEP FIVE Start drying by pressing START STOP BUTTON Unit will automatically turn off at end of cycle MAINTAINING DUTY GEAR Your new drying cabinet is a key part in...

Page 9: ...is very wet or has been separated for mechanical washing hang the paints and jackets with the liners separate For single or double sets of gear separating will reduce the overall cycle time to complet...

Page 10: ...ensure the gear is protected from dirt and debris as well as preventing mildew build up MONTHLY INSPECTION Clean and remove all debris and dust from inside the cabinet Remove plenum from floor and cl...

Page 11: ...VOLUME OPERATIONS QUALIFIED PERSONNEL Properly lock out tag out power supply Disconnect duct and move unit away from the wall Remove and inspect inlet covers and heating duct covers Clean and remove a...

Page 12: ...FH2G Express Dryer Installation Operation and Maintenance Manual 11 P a g e REFERENCE SCHEMATICS...

Page 13: ...FH2G Express Dryer Installation Operation and Maintenance Manual 12 P a g e Reference Fuses Bussman CC Fuses LP CC 4 5 4 5 AMP 600V LP CC 5 0 5 0 AMP 600V...

Page 14: ...t cleaning process or extractor is working correctly Check rear panel with IR Gun to determine if cold spots exist across elements May indicate burnt or damaged element Remove rear panel and individua...

Page 15: ...FH2G Express Dryer Installation Operation and Maintenance Manual 14 P a g e...

Reviews: