RCI 960 Series Installation Download Page 3

960 Installation Instructions 

(Continued)

9 Series Time Delay Wiring Schematic

Cut for 24VDC operation

©2011 RUTHERFORD CONTROLS INT’L CORP. WWW.RUTHERFORDCONTROLS.COM

USA: 2517 SQUADRON COURT, SUITE 104, VIRGINIA BEACH, VA 23453 • CANADA: 210 SHEARSON CRESCENT, CAMBRIDGE, ON  N1T 1J6 

PHONE • 1.800.265.6630 • 519.621.7651 • FAX: 1.800.482.9795 • 519.621.7939 • E-MAIL: [email protected] 

Summary of Contents for 960 Series

Page 1: ...wrench 5 Make wire connections as required see wire connection figure below 6 Fasten faceplate assembly to electrical box with the tamperproof 6 32 machine screws supplied with the spanner hand tool also supplied 4 3 4 120 6mm 3 76mm 1 11 16 N 43mm 1 1 2 38mm 27 32 N 21 5mm C L 1 2 13mm Switch Hole N Narrow Style 960N 1 4 6 3mm 2 3 4 70mm 1 3 16 30mm Rear Profile Optional DPDT Switch Side Profile ...

Page 2: ... 1 4 2 7 8 1 3 16 Time Adjustment Knob Wire to Negative of Power Supply Black Wire Green Wire Red Wire Wire to Positive of Power Supply NOTE To wire LED for green light instead of red light disconnect red wire from switch point and connect green wire 960 Bi Color LED Installation Description Switch Mode Switch Configuration Switch Rating Standard Finish 960 MO Key Switch Momentary Action SPDT N O ...

Page 3: ...4VDC operation 2011 RUTHERFORD CONTROLS INT L CORP WWW RUTHERFORDCONTROLS COM USA 2517 SQUADRON COURT SUITE 104 VIRGINIA BEACH VA 23453 CANADA 210 SHEARSON CRESCENT CAMBRIDGE ON N1T 1J6 PHONE 1 800 265 6630 519 621 7651 FAX 1 800 482 9795 519 621 7939 E MAIL SALES RUTHERFORDCONTROLS COM ...

Page 4: ...of Wire Run ft Load Current 12V 1 4A 1 2A 3 4A 1A 1 1 4A 1 1 2A 2A 3A 100 20 18 16 14 14 12 12 10 150 18 16 14 12 12 12 10 200 16 14 12 12 10 10 250 16 14 12 10 10 10 300 16 12 12 10 10 400 14 12 10 500 14 10 10 750 12 10 1000 10 1500 10 Wire Gauge Chart courtesy of Electronic Locking Devices by John L Schum 2011 RUTHERFORD CONTROLS INT L CORP WWW RUTHERFORDCONTROLS COM USA 2517 SQUADRON COURT SUI...

Reviews: